Filter interviews by
I applied via Referral and was interviewed before Jun 2022. There were 2 interview rounds.
Documents and things needed for confined space activity include permits, gas detectors, harnesses, communication devices, and rescue equipment.
Confined space entry permit
Gas detectors for monitoring air quality
Harnesses for fall protection
Communication devices for staying in contact with team members
Rescue equipment such as tripods, winches, and harnesses
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
posted on 25 Feb 2022
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.
Identify the cause of delay and the impact it had on the project timeline and budget
Document all additional costs incurred due to the delay, including labor, materials, and equipment
Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...
Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.
Identify the critical path of the project
Determine the planned vs actual timeline for each activity
Identify any changes or disruptions that occurred during the project
Quantify the impact of each delay on the project timeline
Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis
Co...
based on 3 interviews
Interview experience
based on 94 reviews
Rating in categories
Instrumentation Technician
15
salaries
| ₹4 L/yr - ₹16 L/yr |
Instrument Engineer
13
salaries
| ₹7.3 L/yr - ₹16.2 L/yr |
Electrical Engineer
8
salaries
| ₹10 L/yr - ₹20 L/yr |
Senior Instrumentation Technician
6
salaries
| ₹0.5 L/yr - ₹1.8 L/yr |
Electrical & Instrumentation Supervisor
5
salaries
| ₹8 L/yr - ₹16 L/yr |
GAMMON INDIA
The Louis Berger Group
Nesma & Partners
El Seif Engineering Contracting