Filter interviews by
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
Top trending discussions
posted on 21 Jan 2024
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
posted on 24 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 21 Jan 2024
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
posted on 25 May 2022
I applied via Company Website and was interviewed in Apr 2022. There were 3 interview rounds.
posted on 11 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The interview question is about 1.33kv&11kv BOQ, power transformer description, and the role of CT/PT.
BOQ for 1.33kv and 11kv involves preparing a bill of quantities for electrical equipment and materials required for the project.
Power transformer description includes its specifications, such as voltage rating, power rating, winding configuration, cooling system, etc.
CT/PT (Current Transformer/Potential Transformer) ar...
Answering questions related to electrical engineering
To find if a transformer is star or delta connected, check the connection of the primary and secondary windings
APL/BPL/AGL materials refer to Above Poverty Line/Below Poverty Line/Anti-Graffiti materials used in construction
ROW stands for Right of Way, which is the legal right to pass through a property or land
posted on 29 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
Civil Site Engineer
33
salaries
| ₹1.3 L/yr - ₹4.9 L/yr |
Site Engineer
27
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Senior Engineer
26
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Junior Engineer
16
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Junior Engineer Civil
16
salaries
| ₹1 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
BHEL