M20 mix ratio refers to the proportion of materials used in concrete mix design.
M20 mix ratio typically consists of 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The mix ratio is usually denoted as 1:1.5:3 (cement:sand:aggregate).
The M20 mix ratio is commonly used for residential construction projects.
The strength of concrete mix can be adjusted by changing the mix ratio.
The nominal size of a brick refers to the size specified by the manufacturer for easy identification and handling.
Nominal size is typically larger than the actual size due to the inclusion of mortar joints.
Common nominal sizes include 4 inches by 8 inches by 2 inches for standard bricks.
It is important to consider the nominal size when planning for bricklaying projects.
Top trending discussions
Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
posted on 10 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.
My salary is determined by factors such as my level of experience in the field.
Qualifications and certifications also play a role in determining my salary.
Market rates for Civil Site Engineers in the specific location where I work also influence my salary.
I am open to discussing salary expectations
posted on 2 Mar 2024
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
posted on 29 Jan 2024
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.
Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.
Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...
posted on 21 Jul 2022
I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.
To make a unit setup as a Draughtsman Civil, you need to follow these steps:
Determine the purpose and requirements of the unit setup
Create a detailed plan or layout of the unit setup
Consider factors such as dimensions, materials, and safety regulations
Use appropriate software or tools to design the unit setup
Collaborate with architects, engineers, and other professionals if necessary
Review and revise the design as need...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.
Hard work and pipeline roadlines work...
All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines
posted on 27 Dec 2019
I applied via Naukri.com and was interviewed in Nov 2019. There was 1 interview round.
Civil Site Engineer
6
salaries
| ₹2 L/yr - ₹2.7 L/yr |
Senior Sales Manager
5
salaries
| ₹7.8 L/yr - ₹10.6 L/yr |
Senior Site Engineer
5
salaries
| ₹4.1 L/yr - ₹5.9 L/yr |
Senior Civil Engineer
4
salaries
| ₹2.6 L/yr - ₹3.8 L/yr |
Project Engineer
4
salaries
| ₹4.2 L/yr - ₹6.1 L/yr |
L&T Construction
Tata Projects
Sterling & Wilson
Shapoorji Pallonji Group