Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ELV Projects Pvt Ltd Team. If you also belong to the team, you can get access from here

ELV Projects Pvt Ltd Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

ELV Projects Pvt Ltd Interview Questions, Process, and Tips

Updated 20 Dec 2024

Top ELV Projects Pvt Ltd Interview Questions and Answers

View all 15 questions

ELV Projects Pvt Ltd Interview Experiences

Popular Designations

7 interviews found

Project Engineer Interview Questions & Answers

user image Pratap Gowda

posted on 10 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Work sequence and quality of work
  • Ans. 

    Work sequence and quality of work are crucial for project success.

    • Establish clear work sequences to ensure tasks are completed in the correct order

    • Monitor and evaluate the quality of work at each stage to prevent errors

    • Implement quality control measures to maintain high standards

    • Provide feedback and training to improve work quality

    • Examples: Using Gantt charts to plan work sequences, conducting regular inspections to ch

  • Answered by AI
  • Q2. Vendors finalization and rate
Round 2 - Technical 

(2 Questions)

  • Q1. Fully detailed of past experience and hindrances of project
  • Q2. Billing and estimation and present vendors rate and piece work rates;
  • Ans. 

    Billing and estimation involves calculating costs for projects based on vendor rates and piece work rates.

    • Gather current vendor rates for materials and services

    • Calculate estimated costs based on project requirements and vendor rates

    • Consider piece work rates for labor costs

    • Ensure accuracy in billing and estimation to avoid cost overruns

    • Negotiate with vendors for competitive rates to reduce project costs

  • Answered by AI

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. SPECIFICATION, AND WORK KNOWLEDGE

Interview Preparation Tips

Interview preparation tips for other job seekers - BE COOL,

Project Manager MEP Interview Questions asked at other Companies

Q1. How many kind for fire proofing for steel structures?
View answer (1)

Interview Questions & Answers

user image Sherena Regi

posted on 20 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About my work experience
Round 2 - One-on-one 

(1 Question)

  • Q1. How I manage my task

Civil Intern Interview Questions & Answers

user image Akshay Manikumar

posted on 6 Jun 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in May 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. M20 mix r ratio
  • Ans. 

    M20 mix ratio refers to the proportion of materials used in concrete mix design.

    • M20 mix ratio typically consists of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • The mix ratio is usually denoted as 1:1.5:3 (cement:sand:aggregate).

    • The M20 mix ratio is commonly used for residential construction projects.

    • The strength of concrete mix can be adjusted by changing the mix ratio.

  • Answered by AI
  • Q2. Nominal size of Brick
  • Ans. 

    The nominal size of a brick refers to the size specified by the manufacturer for easy identification and handling.

    • Nominal size is typically larger than the actual size due to the inclusion of mortar joints.

    • Common nominal sizes include 4 inches by 8 inches by 2 inches for standard bricks.

    • It is important to consider the nominal size when planning for bricklaying projects.

  • Answered by AI

Civil Intern Interview Questions asked at other Companies

Q1. Nominal size of Brick
View answer (1)

ELV Projects Pvt Ltd interview questions for popular designations

 Assistant Project Manager

 (1)

 Project Engineer

 (1)

 HR Manager

 (1)

 QA QC Engineer

 (1)

 Civil Intern

 (1)

 Project Manager MEP

 (1)

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About your work and related technical questions
  • Q2. About work and responsibilities and related questions
  • Q3. Question on ur works
Round 3 - Technical 

(1 Question)

  • Q1. Question on process of works, Materials rates, Productivity, BOQ
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion and benefits of company

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont Join to the company, No growth, No goals, False Promises, No Commitmnets, Payments delay for Contractors

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)

I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - One-on-one 

(14 Questions)

  • Q1. What do you mean by QA QC ?
  • Ans. 

    QA QC stands for Quality Assurance and Quality Control.

    • QA QC is a set of processes and activities that ensure the quality of a product or service.

    • Quality Assurance focuses on preventing defects and ensuring that processes are followed correctly.

    • Quality Control involves inspecting and testing the product or service to identify defects and ensure it meets the required standards.

    • QA QC is important in various industries su...

  • Answered by AI
  • Q2. Max grade of concrete used at your site?
  • Ans. 

    The maximum grade of concrete used at our site is M40.

    • M40 grade concrete is commonly used for heavy-duty structures like bridges and high-rise buildings.

    • It has a compressive strength of 40 megapascals (MPa) after 28 days of curing.

    • The mix proportion for M40 concrete is 1:1.5:3 (cement:sand:aggregate).

  • Answered by AI
  • Q3. Write down the Design mix of the particular grade of concrete?
  • Ans. 

    The design mix of a particular grade of concrete depends on the required strength and other factors.

    • The design mix includes the proportion of cement, sand, aggregates, and water.

    • For example, the design mix for M20 grade concrete is 1:1.5:3 (cement:sand:aggregates) with a water-cement ratio of 0.5.

    • The design mix is determined by conducting trials and tests on the materials used.

    • The mix should be adjusted based on factor...

  • Answered by AI
  • Q4. What is price of particular grade of concrete (RMC) ?
  • Ans. 

    The price of a particular grade of concrete (RMC) varies depending on several factors such as location, quantity, and grade.

    • The price of RMC is influenced by the location of the project.

    • The quantity of RMC required also affects the price.

    • The grade of RMC needed for the project is a significant factor in determining the price.

    • The price of RMC can range from $80 to $150 per cubic meter depending on the above factors.

  • Answered by AI
  • Q5. What are the ingredients of the concrete?
  • Ans. 

    The ingredients of concrete are cement, water, aggregates, and admixtures.

    • Cement is the binding agent that holds the mixture together

    • Water is added to activate the cement and make the mixture workable

    • Aggregates are the coarse and fine materials that make up the bulk of the mixture

    • Admixtures are added to modify the properties of the concrete, such as setting time or workability

    • Examples of admixtures include air-entraini...

  • Answered by AI
  • Q6. What do you mean by GGBS?
  • Ans. 

    GGBS stands for Ground Granulated Blast Furnace Slag.

    • GGBS is a by-product of the iron-making industry.

    • It is obtained by quenching molten iron slag from a blast furnace with water or steam.

    • GGBS is used as a partial replacement for Portland cement in concrete production.

    • It improves the durability, workability, and strength of concrete.

    • GGBS reduces the heat of hydration and the risk of thermal cracking in concrete.

    • It also...

  • Answered by AI
  • Q7. How do you determine the grade of the received concrete at the site (Before Unloading from TM)?
  • Ans. 

    The grade of received concrete at the site can be determined by checking the documentation, conducting visual inspections, and performing tests.

    • Check the documentation provided by the supplier, which should mention the grade of the concrete.

    • Conduct visual inspections to assess the appearance and consistency of the concrete. Different grades may have different characteristics.

    • Perform tests such as slump test, compressiv...

  • Answered by AI
  • Q8. What are the pre-checking for the tiling activity?
  • Ans. 

    Pre-checking for tiling activity includes surface preparation, layout planning, and material inspection.

    • Ensure the surface is clean, dry, and level

    • Check for any cracks or unevenness in the surface

    • Plan the layout of tiles to ensure symmetry and avoid cutting small pieces

    • Inspect the tiles for any defects or damages before installation

    • Check the adhesive and grout for compatibility with the tiles

    • Verify the correct tile siz

  • Answered by AI
  • Q9. How do you start the tiling works in bathroom?
  • Ans. 

    The tiling works in bathroom should start with proper surface preparation and layout planning.

    • Ensure the surface is clean, dry, and level

    • Plan the layout to avoid small cuts and ensure symmetry

    • Start tiling from the center of the wall or floor

    • Use spacers to maintain consistent gaps between tiles

    • Apply adhesive evenly and in small sections

    • Check for level and adjust as needed

    • Allow adhesive to dry before grouting

  • Answered by AI
  • Q10. What is Max dia of steel used in the site?
  • Ans. 

    The maximum diameter of steel used on the site varies depending on the specific application and design requirements.

    • The maximum diameter of steel used on the site is determined by the structural design requirements.

    • The maximum diameter of steel used on the site can range from a few millimeters to several inches.

    • The maximum diameter of steel used on the site is typically specified in the project specifications and drawi...

  • Answered by AI
  • Q11. What is the unit weight of that particular dia of steel? (based on your previous answer)
  • Q12. What is Pre-Checking for the painting activity?
  • Ans. 

    Pre-checking is a process of inspecting the surface before painting to ensure it is clean, dry, and free from defects.

    • Inspect surface for cleanliness, dryness, and defects

    • Check for any cracks, holes, or roughness

    • Ensure surface is properly primed

    • Verify that the surface is suitable for the type of paint being used

    • Confirm that the ambient temperature and humidity are within the recommended range

    • Perform adhesion test if ne

  • Answered by AI
  • Q13. List the number of activities in finishing?
  • Q14. List the wastage Co-efficiency?
  • Ans. 

    Wastage Co-efficiency is the ratio of actual wastage to the standard wastage.

    • Wastage Co-efficiency helps in measuring the efficiency of the production process.

    • It is calculated by dividing the actual wastage by the standard wastage.

    • The result is expressed in percentage.

    • A lower wastage co-efficiency indicates better efficiency.

    • For example, if the actual wastage is 10 units and the standard wastage is 15 units, the wastag

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Question will be asked based the work you executed at the site or look after.

Top ELV Projects Pvt Ltd QA QC Engineer Interview Questions and Answers

Q1. How do you determine the grade of the received concrete at the site (Before Unloading from TM)?
View answer (2)

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)

Jobs at ELV Projects Pvt Ltd

View all

HR Manager Interview Questions & Answers

user image Anitha Devaraj

posted on 30 Apr 2022

I applied via Approached by Company and was interviewed in Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Based on the position resumes will be screened
Round 3 - One-on-one 

(1 Question)

  • Q1. On shortlisting on technical will qualify Director's round
Round 4 - HR 

(1 Question)

  • Q1. Final round will be with the HR

Interview Preparation Tips

Interview preparation tips for other job seekers - One of the best places to work with

HR Manager Interview Questions asked at other Companies

Q1. Can you explain the meaning of performance Management as stated in your CV
View answer (5)

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About my experience and what kind of job i can handle etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Mine experience was Nice , they were also kind and gentle . During interview they help me also to define some terms and specifications etc

I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Everything related to our field
  • Q2. Past and current project contributions
  • Q3. What do you think about SPCPL

Interview Preparation Tips

Interview preparation tips for other job seekers - Being a professional firm, professional interview and presentation needs to clear

ELV Projects Pvt Ltd Interview FAQs

How many rounds are there in ELV Projects Pvt Ltd interview?
ELV Projects Pvt Ltd interview process usually has 2-3 rounds. The most common rounds in the ELV Projects Pvt Ltd interview process are Technical, One-on-one Round and HR.
How to prepare for ELV Projects Pvt Ltd interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ELV Projects Pvt Ltd. The most common topics and skills that interviewers at ELV Projects Pvt Ltd expect are Real Estate Sales, Residential Sales, Sales, Project Management and Site Execution.
What are the top questions asked in ELV Projects Pvt Ltd interview?

Some of the top questions asked at the ELV Projects Pvt Ltd interview -

  1. How do you determine the grade of the received concrete at the site (Before Unl...read more
  2. What do you mean by QA Q...read more
  3. What is price of particular grade of concrete (RMC...read more

Tell us how to improve this page.

ELV Projects Pvt Ltd Interview Process

based on 6 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Projects Interview Questions
4.2
 • 433 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

ELV Projects Pvt Ltd Reviews and Ratings

based on 58 reviews

4.2/5

Rating in categories

3.8

Skill development

4.0

Work-life balance

3.9

Salary

4.0

Job security

3.9

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 58 Reviews and Ratings
Senior Purchase Executive

Bangalore / Bengaluru

5-10 Yrs

Not Disclosed

Hr Management Specialist

Bangalore / Bengaluru

5-10 Yrs

Not Disclosed

General Manager

Bangalore / Bengaluru

18-28 Yrs

Not Disclosed

Explore more jobs
Civil Site Engineer
6 salaries
unlock blur

₹2 L/yr - ₹2.7 L/yr

Sales Executive
5 salaries
unlock blur

₹3.5 L/yr - ₹4.5 L/yr

Senior Sales Manager
5 salaries
unlock blur

₹7.8 L/yr - ₹10.6 L/yr

Senior Site Engineer
5 salaries
unlock blur

₹4.1 L/yr - ₹5.9 L/yr

Senior Civil Engineer
4 salaries
unlock blur

₹2.6 L/yr - ₹3.8 L/yr

Explore more salaries
Compare ELV Projects Pvt Ltd with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Sterling & Wilson

4.1
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview