I applied via Referral and was interviewed in Nov 2024. There were 2 interview rounds.
Work sequence and quality of work are crucial for project success.
Establish clear work sequences to ensure tasks are completed in the correct order
Monitor and evaluate the quality of work at each stage to prevent errors
Implement quality control measures to maintain high standards
Provide feedback and training to improve work quality
Examples: Using Gantt charts to plan work sequences, conducting regular inspections to ch
Billing and estimation involves calculating costs for projects based on vendor rates and piece work rates.
Gather current vendor rates for materials and services
Calculate estimated costs based on project requirements and vendor rates
Consider piece work rates for labor costs
Ensure accuracy in billing and estimation to avoid cost overruns
Negotiate with vendors for competitive rates to reduce project costs
I appeared for an interview in May 2024.
M20 mix ratio refers to the proportion of materials used in concrete mix design.
M20 mix ratio typically consists of 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The mix ratio is usually denoted as 1:1.5:3 (cement:sand:aggregate).
The M20 mix ratio is commonly used for residential construction projects.
The strength of concrete mix can be adjusted by changing the mix ratio.
The nominal size of a brick refers to the size specified by the manufacturer for easy identification and handling.
Nominal size is typically larger than the actual size due to the inclusion of mortar joints.
Common nominal sizes include 4 inches by 8 inches by 2 inches for standard bricks.
It is important to consider the nominal size when planning for bricklaying projects.
ELV Projects Pvt Ltd interview questions for popular designations
I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.
QA QC stands for Quality Assurance and Quality Control.
QA QC is a set of processes and activities that ensure the quality of a product or service.
Quality Assurance focuses on preventing defects and ensuring that processes are followed correctly.
Quality Control involves inspecting and testing the product or service to identify defects and ensure it meets the required standards.
QA QC is important in various industries su...
The maximum grade of concrete used at our site is M40.
M40 grade concrete is commonly used for heavy-duty structures like bridges and high-rise buildings.
It has a compressive strength of 40 megapascals (MPa) after 28 days of curing.
The mix proportion for M40 concrete is 1:1.5:3 (cement:sand:aggregate).
The design mix of a particular grade of concrete depends on the required strength and other factors.
The design mix includes the proportion of cement, sand, aggregates, and water.
For example, the design mix for M20 grade concrete is 1:1.5:3 (cement:sand:aggregates) with a water-cement ratio of 0.5.
The design mix is determined by conducting trials and tests on the materials used.
The mix should be adjusted based on factor...
The price of a particular grade of concrete (RMC) varies depending on several factors such as location, quantity, and grade.
The price of RMC is influenced by the location of the project.
The quantity of RMC required also affects the price.
The grade of RMC needed for the project is a significant factor in determining the price.
The price of RMC can range from $80 to $150 per cubic meter depending on the above factors.
The ingredients of concrete are cement, water, aggregates, and admixtures.
Cement is the binding agent that holds the mixture together
Water is added to activate the cement and make the mixture workable
Aggregates are the coarse and fine materials that make up the bulk of the mixture
Admixtures are added to modify the properties of the concrete, such as setting time or workability
Examples of admixtures include air-entraini...
GGBS stands for Ground Granulated Blast Furnace Slag.
GGBS is a by-product of the iron-making industry.
It is obtained by quenching molten iron slag from a blast furnace with water or steam.
GGBS is used as a partial replacement for Portland cement in concrete production.
It improves the durability, workability, and strength of concrete.
GGBS reduces the heat of hydration and the risk of thermal cracking in concrete.
It also...
The grade of received concrete at the site can be determined by checking the documentation, conducting visual inspections, and performing tests.
Check the documentation provided by the supplier, which should mention the grade of the concrete.
Conduct visual inspections to assess the appearance and consistency of the concrete. Different grades may have different characteristics.
Perform tests such as slump test, compressiv...
Pre-checking for tiling activity includes surface preparation, layout planning, and material inspection.
Ensure the surface is clean, dry, and level
Check for any cracks or unevenness in the surface
Plan the layout of tiles to ensure symmetry and avoid cutting small pieces
Inspect the tiles for any defects or damages before installation
Check the adhesive and grout for compatibility with the tiles
Verify the correct tile siz
The tiling works in bathroom should start with proper surface preparation and layout planning.
Ensure the surface is clean, dry, and level
Plan the layout to avoid small cuts and ensure symmetry
Start tiling from the center of the wall or floor
Use spacers to maintain consistent gaps between tiles
Apply adhesive evenly and in small sections
Check for level and adjust as needed
Allow adhesive to dry before grouting
The maximum diameter of steel used on the site varies depending on the specific application and design requirements.
The maximum diameter of steel used on the site is determined by the structural design requirements.
The maximum diameter of steel used on the site can range from a few millimeters to several inches.
The maximum diameter of steel used on the site is typically specified in the project specifications and drawi...
Pre-checking is a process of inspecting the surface before painting to ensure it is clean, dry, and free from defects.
Inspect surface for cleanliness, dryness, and defects
Check for any cracks, holes, or roughness
Ensure surface is properly primed
Verify that the surface is suitable for the type of paint being used
Confirm that the ambient temperature and humidity are within the recommended range
Perform adhesion test if ne
Wastage Co-efficiency is the ratio of actual wastage to the standard wastage.
Wastage Co-efficiency helps in measuring the efficiency of the production process.
It is calculated by dividing the actual wastage by the standard wastage.
The result is expressed in percentage.
A lower wastage co-efficiency indicates better efficiency.
For example, if the actual wastage is 10 units and the standard wastage is 15 units, the wastag
I applied via Approached by Company and was interviewed in Mar 2022. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
based on 6 interviews
Interview experience
based on 58 reviews
Rating in categories
Civil Site Engineer
6
salaries
| ₹2 L/yr - ₹2.7 L/yr |
Sales Executive
5
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Senior Sales Manager
5
salaries
| ₹7.8 L/yr - ₹10.6 L/yr |
Senior Site Engineer
5
salaries
| ₹4.1 L/yr - ₹5.9 L/yr |
Senior Civil Engineer
4
salaries
| ₹2.6 L/yr - ₹3.8 L/yr |
L&T Construction
Tata Projects
Sterling & Wilson
Shapoorji Pallonji Group