i
ELV Projects Pvt Ltd
Filter interviews by
Top trending discussions
posted on 17 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 21 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
It was basic level coding question. you can answer if you strong in basic level of java
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
posted on 23 Jul 2024
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
Software or tool test
posted on 9 Oct 2021
I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Site Engineer
6
salaries
| ₹2 L/yr - ₹2.7 L/yr |
Sales Executive
5
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Senior Sales Manager
5
salaries
| ₹7.8 L/yr - ₹10.6 L/yr |
Senior Site Engineer
5
salaries
| ₹4.1 L/yr - ₹5.9 L/yr |
Senior Civil Engineer
4
salaries
| ₹2.6 L/yr - ₹3.8 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group