I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
Testing and commissioning of TVS system involves various activities to ensure its proper functioning.
Verification of wiring and connections
Functional testing of individual components
Integration testing of the entire system
Performance testing under different load conditions
Verification of safety features
Documentation of test results and commissioning procedures
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Site Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Civil Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Civil Site Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Sterling & Wilson
Shapoorji Pallonji Group