posted on 6 Jul 2024
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 12 Aug 2024
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
posted on 21 Jun 2024
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.
1. Coagulation: Adding chemicals to water to make particles clump together.
2. Sedimentation: Allowing the clumped particles to settle at the bottom.
3. Filtration: Passing water through filters to remove remaining particles.
4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.
5. Distribution: ...
posted on 12 Sep 2022
The question is about the specifications of different layers in a flexible pavement.
The embankment layer has a thickness of 3m and is compacted at 95% with large size soil particles and effective CBR as per design.
The subgrade layer has a total thickness of 500mm and is compacted at 97% with large size soil particles and effective CBR as per design.
The GSB layer has a total thickness of 300mm and is a mixture of aggreg...
Design procedure for laying M15 grade concrete with specific requirements for cement content, compressive strength, and compaction.
Use M15 grade concrete with aggregate and cement ratio of 1:2
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Ensure compressive strength of 10MPA after 7 days curing, with no sample below 7.5MPA
Ensure DLC premix batching plant material is homogeneous and ...
Design procedure for PQC using M40 grade concrete
Minimum cement content of 360kg per cum
Flexural strength of 4.5MPA and compressive strength of 40MPA after 28-day curing
Dowel bars and tie bars provided for load transfer and prevention of cracking and deflection
PQC mix prepared in pre-mix batching plant and transported to site
Separation membrane and texturing and sawing operations performed for proper finishing
28-day cu...
Different types of carriage way include single lane, multilane, intermediate lane, two lane, three lane, and four lane.
Single lane has a width of 3.75m
Multilane has a width of 3.50m
Intermediate lane has a width of 5.5m
Two lane has a width of 7.5m
Three lane has a width of 10.50m
Four lane has a width of 7.5m + 7.5m
posted on 31 Aug 2022
The grade of concrete normally used for RCC is M20.
The grade of concrete for RCC (Reinforced Cement Concrete) is determined based on the design requirements and structural considerations.
The most commonly used grade of concrete for RCC is M20, which means the concrete mix has a compressive strength of 20 megapascals (MPa) after 28 days of curing.
Other grades of concrete like M25, M30, M35, etc., can also be used depend...
Pre-initiative actions for start piling
Conduct a geotechnical investigation to assess soil conditions
Obtain necessary permits and approvals from local authorities
Develop a detailed piling plan and schedule
Procure required piling equipment and materials
Ensure safety measures are in place for workers and surrounding areas
Prepare the site by clearing any obstacles or debris
Establish proper communication channels with stak...
The duration for deshuttering a beam of span 4 mtr depends on various factors.
The type of formwork used for shuttering the beam
The strength of the concrete used
The ambient temperature and humidity
The curing process followed
The complexity of the beam design
The availability of manpower and equipment
Typically, deshuttering can take anywhere from 7 to 21 days for a beam of span 4 mtr
To define one way and two way slab, we follow different procedures. For two way slab, reinforcement is fixed in both directions.
One way slab is defined as the slab in which the ratio of longer span to shorter span is greater than or equal to 2.
Two way slab is defined as the slab in which the ratio of longer span to shorter span is less than 2.
For two way slab, reinforcement is fixed in both directions to distribute the...
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
posted on 4 May 2024
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
posted on 17 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Take appropriate action against contractors not complying with specifications.
Identify the specific non-compliance issues
Communicate the non-compliance to the contractors
Request corrective actions or modifications to meet the specifications
Monitor and document the progress of corrective actions
Consider penalties or contract termination if non-compliance persists
posted on 2 Oct 2021
Bridges can be classified as major, minor or normal based on their importance and traffic volume.
Major bridges are those that connect important cities or regions and have high traffic volume.
Minor bridges are those that connect smaller towns or villages and have lower traffic volume.
Normal bridges are those that fall in between major and minor bridges in terms of importance and traffic volume.
Factors such as length, wi...
Pier is a vertical structure that supports the weight of a bridge, while abutment is a horizontal structure that supports the ends of a bridge.
Pier is a vertical structure that supports the weight of a bridge, while abutment is a horizontal structure that supports the ends of a bridge.
Piers are usually located in the middle of a bridge, while abutments are located at the ends of a bridge.
Piers are typically made of con...
CA of river, nalla, local nalla can be found by studying the catchment area and rainfall data.
Study the catchment area of the river, nalla, or local nalla
Collect rainfall data of the area
Calculate the runoff coefficient using the catchment area and rainfall data
Multiply the runoff coefficient with the total rainfall to get the CA
CA = Runoff Coefficient x Total Rainfall
CA is important for designing drainage systems and
Civil Site Engineer
44
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Project Manager
16
salaries
| ₹7.6 L/yr - ₹27.1 L/yr |
Accountant
16
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Junior Engineer
16
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Highway Engineer
15
salaries
| ₹2.4 L/yr - ₹5.3 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure