Upload Button Icon Add office photos

Filter interviews by

Eagle Infra IT Infrastructure Manager Interview Questions and Answers

Updated 14 Aug 2024

Eagle Infra IT Infrastructure Manager Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Nice test to attempt which brings out real courage inside you

Round 2 - One-on-one 

(3 Questions)

  • Q1. What is uranium?
  • Ans. 

    Uranium is a radioactive chemical element with the symbol U and atomic number 92.

    • Uranium is a heavy metal that is naturally occurring in the Earth's crust.

    • It is commonly used as a fuel in nuclear power plants to generate electricity.

    • Uranium is also used in nuclear weapons and in some medical treatments, such as radiation therapy.

    • There are several isotopes of uranium, with uranium-235 being the most commonly used in nuc

  • Answered by AI
  • Q2. What is yelling crow?
  • Ans. 

    Yelling crow is a term used in the IT industry to describe a situation where multiple alerts or notifications are being sent out simultaneously.

    • Yelling crow can occur when there are multiple system failures or issues happening at the same time.

    • It can also happen when there are numerous monitoring tools in place that all trigger alerts at once.

    • Managing yelling crow situations requires prioritizing and addressing the mos...

  • Answered by AI
  • Q3. What is kerosene?
  • Ans. 

    Kerosene is a type of flammable liquid fuel commonly used for heating, cooking, and lighting.

    • Kerosene is derived from petroleum and is similar to diesel fuel but with a lower boiling point.

    • It is often used in lamps, stoves, and heaters in areas where electricity is not readily available.

    • Kerosene is also used as a fuel for jet engines and in some types of rockets.

    • It is important to handle kerosene with care due to its f

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep courage

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. What is consolidation of soil?
  • Ans. 

    Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.

    • Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.

    • This process is time-dependent and can take years to complete.

    • Consolidation can cause settlement and deformation of structures built on top of the...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Assistant Manager interview:
  • Soil Mechanics
Interview preparation tips for other job seekers - Prepare technically basic questions

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduction about yourself
  • Ans. I'm answering Smoothly about my self
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions Like 1- Estimation and Costing 2- Rate Analysis 3- Planning and Praposal 4- Vendor Selection and Database 6- What do you mean by Hydrocarbon
Round 3 - Assignment 

1- Material Calculation
2- Bar bending Schedule
3- Planning and Chart
4- Making Praposal

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- Special thing is that you should speak in English and be Confident.
2- Learn that before you to interview about which post you choose etc.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About blasting process
  • Q2. About painting quantity
  • Q3. Material management
  • Q4. About Working skills
  • Q5. Technical question related painting and blasting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Will ask all related questions.
  • Q2. Do u know Piping engineering?
  • Ans. 

    Yes, I have knowledge in Piping engineering.

    • I have a degree in Mechanical Engineering which includes coursework in Piping design and analysis.

    • I have practical experience working on piping projects in my previous roles.

    • I am familiar with industry standards and codes related to piping engineering such as ASME B31.3 and API 570.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Expectation of salary, why job switch.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is COS and stages involved init
  • Ans. 

    COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.

    • COS includes costs such as raw materials, labor, and manufacturing overhead.

    • Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.

    • Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...

  • Answered by AI
  • Q2. What do you mean by EOT
  • Ans. 

    EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.

    • EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.

    • It is represented by the ASCII control character with the code 04.

    • EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...

  • Answered by AI
  • Q3. What is a CLAIM
  • Ans. 

    A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.

    • A claim is typically submitted by a policyholder or healthcare provider to an insurance company.

    • It includes details such as the services provided, dates of service, and the amount billed.

    • The insurance company reviews the claim to determine if it meets the policy's coverage criteria.

    • Once approved, the ...

  • Answered by AI
  • Q4. What do you mean by RFI
  • Ans. 

    RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.

    • RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.

    • It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.

    • RFIs are often used as a preliminary step before issui...

  • Answered by AI
  • Q5. How todo Estimates
  • Ans. 

    Estimates are calculated predictions of the cost, time, and resources required for a project.

    • Gather all relevant information and data related to the project

    • Break down the project into smaller tasks or components

    • Use historical data or industry benchmarks to estimate the time and cost for each task

    • Consider any potential risks or uncertainties that may impact the estimates

    • Document the estimates and communicate them clearl

  • Answered by AI

Skills evaluated in this interview

Eagle Infra Interview FAQs

How many rounds are there in Eagle Infra IT Infrastructure Manager interview?
Eagle Infra interview process usually has 2 rounds. The most common rounds in the Eagle Infra interview process are Aptitude Test and One-on-one Round.
What are the top questions asked in Eagle Infra IT Infrastructure Manager interview?

Some of the top questions asked at the Eagle Infra IT Infrastructure Manager interview -

  1. What is yelling cr...read more
  2. What is urani...read more
  3. What is kerose...read more

Tell us how to improve this page.

Eagle Infra IT Infrastructure Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 762 Interviews
AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
View all
Civil Site Engineer
44 salaries
unlock blur

₹2 L/yr - ₹5.7 L/yr

Junior Engineer
16 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Civil Engineer
16 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Accountant
16 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Highway Engineer
15 salaries
unlock blur

₹2.4 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Eagle Infra with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview