I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Construction related any questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job eagle infra India ltd construction company

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Face to face interview

Round 2 - Technical 

(5 Questions)

  • Q1. What is the BBS and Survey
  • Ans. 

    BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.

    • BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.

    • Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.

    • Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient

  • Answered by AI
  • Q2. What is the estimation
  • Ans. 

    Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.

    • Estimation involves determining the quantities of materials needed for a project.

    • It also includes calculating the labor hours required for the project.

    • Estimation considers the costs of equipment and other resources needed for the project.

    • Estimation helps in creating a budget and timel

  • Answered by AI
  • Q3. What is the soil test
  • Ans. 

    Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.

    • Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.

    • Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.

    • Results of soil tests help in designing foundations, pavements, retaining walls, and other s...

  • Answered by AI
  • Q4. What is the RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.

    • RCC is a versatile construction material used in buildings, bridges, dams, etc.

    • It combines the compressive strength of concrete with the tensile strength of steel reinforcement.

    • RCC elements include beams, columns, slabs, and foundations.

    • Example: RCC beams are used to support the load of the structure and transfer it...

  • Answered by AI
  • Q5. What is the DPR
  • Ans. 

    DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.

    • DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.

    • It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.

    • DPR is crucial for obtaining approvals, funding, and ensuring the su...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the branding sedule and explain
  • Ans. 

    Branding schedule is a plan outlining the timeline and activities for promoting a brand.

    • Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.

    • It helps ensure consistency in brand messaging and image across different platforms and channels.

    • Example: A branding schedule for a new product launch may include market research, l...

  • Answered by AI
  • Q2. Tel me concrete grade and mixing ratio
  • Ans. 

    Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.

    • Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.

    • Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.

    • For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen

  • Answered by AI
  • Q3. How to do LABER maintenance in site
  • Ans. 

    Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.

    • Create a maintenance schedule for all equipment and tools used on site.

    • Check for any signs of wear and tear on equipment and tools.

    • Clean and lubricate equipment regularly to prevent rust and corrosion.

    • Replace any damaged or worn out parts immediately.

    • Train site workers on proper handling and maintenance of e...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for URC Construction Civil Site Engineer interview:
  • Civil Engineering
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

It was very good , they give certain time to prepare yourself

Round 2 - Aptitude Test 

It's basically arithmetic and reasoning test

Round 3 - Technical 

(2 Questions)

  • Q1. What is the nominal size of brick
  • Ans. 

    The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.

    • The nominal size of a brick is typically larger than its actual size to account for mortar joints.

    • Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.

    • It is important to consider the nominal size when planning and designing brickwork pr

  • Answered by AI
  • Q2. What are the admixture of concrete
  • Ans. 

    Admixtures are added to concrete to alter its properties or enhance its performance.

    • Admixtures can improve workability, durability, strength, and set time of concrete

    • Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers

    • Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Get your knowledge about construction
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Cut length of spiral stirrup for pile..
  • Ans. 

    The cut length of spiral stirrup for a pile is determined based on the diameter of the pile and the spacing required for the stirrups.

    • Calculate the circumference of the pile using the formula C = π * d, where d is the diameter of the pile.

    • Determine the spacing required for the spiral stirrups based on design specifications.

    • Multiply the circumference of the pile by the number of required spiral stirrups to get the total...

  • Answered by AI
  • Q2. Axial load on column
  • Ans. 

    Axial load on column refers to the vertical force acting on the column, typically due to the weight of the structure it supports.

    • Axial load is the force that acts along the longitudinal axis of the column.

    • It is important to consider axial load in column design to ensure structural stability.

    • Examples of factors affecting axial load include dead loads, live loads, and wind loads on the structure.

  • Answered by AI
Round 1 - Technical 

(1 Question)

  • Q1. Question about metro projects and pile foundation.
Round 2 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why we will hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok.You can join there. Currently they have a lot of projects in india.

I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M30 concrete
  • Ans. 

    M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.

    • M30 concrete is commonly used in construction projects that require high strength and durability.

    • It is made by mixing cement, sand, and coarse aggregates in a specific ratio.

    • The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.

    • M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.

    • I...

  • Answered by AI
  • Q2. 1 cum rcc weight
  • Q3. What should be the rebar grade
  • Ans. 

    The rebar grade should be selected based on the design requirements and the structural load capacity.

    • The rebar grade is determined by the design engineer based on the structural requirements.

    • The grade of rebar is usually specified in the structural drawings and specifications.

    • The most commonly used rebar grades are 40, 60, and 75.

    • The higher the grade of rebar, the stronger it is and the more load it can bear.

    • The rebar ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always time follow technical specification .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Which material use in construction?
  • Ans. 

    Various materials are used in construction including concrete, steel, wood, brick, and asphalt.

    • Concrete is commonly used for foundations, walls, and floors

    • Steel is used for structural frames and reinforcement

    • Wood is used for framing, flooring, and finishing

    • Brick is used for walls and facades

    • Asphalt is used for roads and pavements

  • Answered by AI
  • Q2. What are the temprature of concrete?
  • Ans. 

    The temperature of concrete can vary depending on factors such as the mix design, curing conditions, and ambient temperature.

    • The temperature of freshly mixed concrete is typically between 50-75 degrees Fahrenheit.

    • During curing, the concrete temperature should be maintained above 50 degrees Fahrenheit for proper hydration.

    • Extreme temperatures, either too hot or too cold, can affect the strength and durability of concret...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site Engineer interview:
  • Construction Engineering
Interview preparation tips for other job seekers - Good technical skill, and computer knowledge,etc

Eagle Infra Interview FAQs

How many rounds are there in Eagle Infra Civil Site Engineer interview?
Eagle Infra interview process usually has 2 rounds. The most common rounds in the Eagle Infra interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Eagle Infra Civil Site Engineer Salary
based on 44 salaries
₹2 L/yr - ₹5.7 L/yr
6% more than the average Civil Site Engineer Salary in India
View more details

Eagle Infra Civil Site Engineer Reviews and Ratings

based on 13 reviews

4.3/5

Rating in categories

3.8

Skill development

4.0

Work-life balance

4.0

Salary

3.3

Job security

3.5

Company culture

3.9

Promotions

3.5

Work satisfaction

Explore 13 Reviews and Ratings
Civil Site Engineer
44 salaries
unlock blur

₹2 L/yr - ₹5.7 L/yr

Project Manager
17 salaries
unlock blur

₹7.8 L/yr - ₹28 L/yr

Accountant
16 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Junior Engineer
16 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Highway Engineer
15 salaries
unlock blur

₹2.4 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Eagle Infra with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview