Filter interviews by
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.
Face to face interview
BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.
BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.
Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.
Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient
Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.
Estimation involves determining the quantities of materials needed for a project.
It also includes calculating the labor hours required for the project.
Estimation considers the costs of equipment and other resources needed for the project.
Estimation helps in creating a budget and timel
Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.
Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.
Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.
Results of soil tests help in designing foundations, pavements, retaining walls, and other s...
RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.
RCC is a versatile construction material used in buildings, bridges, dams, etc.
It combines the compressive strength of concrete with the tensile strength of steel reinforcement.
RCC elements include beams, columns, slabs, and foundations.
Example: RCC beams are used to support the load of the structure and transfer it...
DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.
DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.
It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.
DPR is crucial for obtaining approvals, funding, and ensuring the su...
posted on 18 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Branding schedule is a plan outlining the timeline and activities for promoting a brand.
Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.
It helps ensure consistency in brand messaging and image across different platforms and channels.
Example: A branding schedule for a new product launch may include market research, l...
Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.
Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.
For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen
Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.
Create a maintenance schedule for all equipment and tools used on site.
Check for any signs of wear and tear on equipment and tools.
Clean and lubricate equipment regularly to prevent rust and corrosion.
Replace any damaged or worn out parts immediately.
Train site workers on proper handling and maintenance of e...
posted on 3 May 2023
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
posted on 22 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.
It was very good , they give certain time to prepare yourself
It's basically arithmetic and reasoning test
The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.
The nominal size of a brick is typically larger than its actual size to account for mortar joints.
Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.
It is important to consider the nominal size when planning and designing brickwork pr
Admixtures are added to concrete to alter its properties or enhance its performance.
Admixtures can improve workability, durability, strength, and set time of concrete
Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers
Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
The cut length of spiral stirrup for a pile is determined based on the diameter of the pile and the spacing required for the stirrups.
Calculate the circumference of the pile using the formula C = π * d, where d is the diameter of the pile.
Determine the spacing required for the spiral stirrups based on design specifications.
Multiply the circumference of the pile by the number of required spiral stirrups to get the total...
Axial load on column refers to the vertical force acting on the column, typically due to the weight of the structure it supports.
Axial load is the force that acts along the longitudinal axis of the column.
It is important to consider axial load in column design to ensure structural stability.
Examples of factors affecting axial load include dead loads, live loads, and wind loads on the structure.
posted on 20 Feb 2022
posted on 1 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.
M30 concrete is commonly used in construction projects that require high strength and durability.
It is made by mixing cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.
M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.
I...
The rebar grade should be selected based on the design requirements and the structural load capacity.
The rebar grade is determined by the design engineer based on the structural requirements.
The grade of rebar is usually specified in the structural drawings and specifications.
The most commonly used rebar grades are 40, 60, and 75.
The higher the grade of rebar, the stronger it is and the more load it can bear.
The rebar ...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Various materials are used in construction including concrete, steel, wood, brick, and asphalt.
Concrete is commonly used for foundations, walls, and floors
Steel is used for structural frames and reinforcement
Wood is used for framing, flooring, and finishing
Brick is used for walls and facades
Asphalt is used for roads and pavements
The temperature of concrete can vary depending on factors such as the mix design, curing conditions, and ambient temperature.
The temperature of freshly mixed concrete is typically between 50-75 degrees Fahrenheit.
During curing, the concrete temperature should be maintained above 50 degrees Fahrenheit for proper hydration.
Extreme temperatures, either too hot or too cold, can affect the strength and durability of concret...
based on 13 reviews
Rating in categories
Civil Site Engineer
44
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Project Manager
17
salaries
| ₹7.8 L/yr - ₹28 L/yr |
Accountant
16
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Junior Engineer
16
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Highway Engineer
15
salaries
| ₹2.4 L/yr - ₹5.3 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure