Filter interviews by
Prestressing is a technique used in construction to introduce stresses in a structural member before it is subjected to loads.
Prestressing involves applying forces to a concrete element to counteract the stresses that will occur when the element is subjected to loads.
There are two main types of prestressing: pre-tensioning and post-tensioning.
Pre-tensioning involves placing tendons in a mold before pouring concrete, th...
Profiling is the process of analyzing and recording the characteristics of a particular area or group of people.
Profiling involves gathering data on specific attributes or behaviors of a target group.
It is commonly used in marketing to identify target demographics for products or services.
In law enforcement, profiling may refer to the practice of identifying potential suspects based on certain characteristics or behavi...
Aptitude is easy test which is included in unit conversion, reasoning, general knowledge etc.
I applied via Company Website and was interviewed before Nov 2022. There were 3 interview rounds.
Maths reasoning with special problem based question
Give a topic for discussion
I applied via Company Website and was interviewed before Jun 2022. There were 4 interview rounds.
Maths aptitudes on maths formula
Dynamic Prestress interview questions for popular designations
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
Experienced project manager with a proven track record of successfully delivering complex projects on time and within budget.
Managed a team of 10 developers to deliver a software application ahead of schedule
Implemented project management methodologies to improve efficiency and reduce costs
Strong communication and leadership skills
Ability to prioritize tasks and manage multiple projects simultaneously
Communication is crucial for a project manager to ensure successful project completion.
Effective communication helps in setting clear expectations and goals
It helps in identifying and resolving issues and conflicts
It ensures stakeholders are informed and engaged throughout the project
It helps in building trust and maintaining good relationships with team members and stakeholders
Examples include regular team meetings, p
Pre-stressing and post-stressing are methods used to increase the strength and durability of concrete structures.
Pre-stressing involves applying stress to the concrete before it is loaded, which helps to counteract the stresses that will be applied during use.
Post-stressing involves applying stress to the concrete after it has been loaded, which helps to redistribute the stresses and increase the strength of the struct...
Managed multiple projects in IT industry with cross-functional teams and delivered them on time and within budget.
Managed project timelines, budgets, and resources
Coordinated with cross-functional teams including developers, designers, and QA
Ensured project deliverables met quality standards
Communicated project status and risks to stakeholders
Handled multiple projects simultaneously
Examples: Developed and launched a mo...
Top trending discussions
I was interviewed in Feb 2025.
I was interviewed in Dec 2024.
Technical aptitude related to wiring, symbol identify, software related
I was interviewed in Jan 2025.
posted on 18 Feb 2025
I was interviewed in Jan 2025.
I was interviewed in Nov 2024.
The procedure for wind calculation as per IS code involves determining the design wind speed, selecting the appropriate terrain category, and calculating the wind pressure.
Determine the design wind speed based on the location and height of the structure.
Select the appropriate terrain category (rural, urban, etc.) as per IS code guidelines.
Calculate the wind pressure using the formula provided in the IS code.
Consider fa...
A STAAD model for a fixed pole is a structural analysis and design model used to determine the stability and strength of a pole that is fixed in place.
In a STAAD model for a fixed pole, the pole is typically modeled as a vertical member with fixed supports at the base.
The model considers factors such as wind loads, dead loads, and any other relevant loads that may act on the pole.
The analysis helps in determining the s...
Key considerations in designing a square base plate
Ensure the base plate is large enough to support the load without excessive deflection
Select appropriate material and thickness to meet structural requirements
Consider the connection details for attaching the base plate to the structure
Account for any potential corrosion or environmental factors that may affect the base plate
Include provisions for anchor bolts or other...
based on 3 interviews
Interview experience
based on 79 reviews
Rating in categories
Site Engineer
35
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Junior Engineer
23
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Engineer
16
salaries
| ₹2.9 L/yr - ₹4.5 L/yr |
Technician
8
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Junior Engineer Civil
7
salaries
| ₹2.9 L/yr - ₹3.2 L/yr |
Simplex Infrastructures
ITD Cementation India
Nagarjuna Construction Company
Larsen & Toubro Limited