Filter interviews by
I appeared for an interview in Nov 2024.
The procedure for wind calculation as per IS code involves determining the design wind speed, selecting the appropriate terrain category, and calculating the wind pressure.
Determine the design wind speed based on the location and height of the structure.
Select the appropriate terrain category (rural, urban, etc.) as per IS code guidelines.
Calculate the wind pressure using the formula provided in the IS code.
Consider fa...
A STAAD model for a fixed pole is a structural analysis and design model used to determine the stability and strength of a pole that is fixed in place.
In a STAAD model for a fixed pole, the pole is typically modeled as a vertical member with fixed supports at the base.
The model considers factors such as wind loads, dead loads, and any other relevant loads that may act on the pole.
The analysis helps in determining the s...
Key considerations in designing a square base plate
Ensure the base plate is large enough to support the load without excessive deflection
Select appropriate material and thickness to meet structural requirements
Consider the connection details for attaching the base plate to the structure
Account for any potential corrosion or environmental factors that may affect the base plate
Include provisions for anchor bolts or other...
I applied via Naukri.com and was interviewed before Feb 2023. There were 2 interview rounds.
Aptitude test is conducted by organization to know the problem solving ability of candidate.
Different types of connections in steel structures include welded connections, bolted connections, and riveted connections.
Welded connections involve joining steel members by welding them together.
Bolted connections use bolts and nuts to connect steel members.
Riveted connections use rivets to connect steel members.
Other types of connections include pinned connections and moment-resisting connections.
Examples: Welded be...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
posted on 12 Nov 2015
I applied via Campus Placement
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
To design a swimming diving board, I will consider the material, dimensions, weight capacity, and safety features.
Choose a durable and non-slip material like fiberglass or aluminum
Determine the appropriate length, width, and thickness based on the intended use and user demographics
Calculate the weight capacity and ensure it can support the maximum weight of a user
Incorporate safety features like a non-slip surface, rou...
I applied via Campus Placement
based on 3 interviews
Interview experience
based on 4 reviews
Rating in categories
Senior Engineer
29
salaries
| ₹5.6 L/yr - ₹13.5 L/yr |
Detailing Engineer
28
salaries
| ₹2.8 L/yr - ₹8 L/yr |
Design Engineer
24
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Quality Engineer
19
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Manager
13
salaries
| ₹8 L/yr - ₹14.2 L/yr |
John Deere
Caterpillar Inc
Atlas Copco
Hitachi