Upload Button Icon Add office photos

Dilip Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Dilip Buildcon Interview Questions, Process, and Tips for Experienced

Updated 8 Mar 2025

Top Dilip Buildcon Interview Questions and Answers for Experienced

View all 57 questions

Dilip Buildcon Interview Experiences for Experienced

Popular Designations

87 interviews found

I applied via Company Website and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All q from NATM related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good & Keep dip knowledge of site

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Introduce yourself (Technically)
  • Q2. Thereafter all the questions are based on my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - First of all, you have to be the confidant and never hesitate to accept, prepare resume only with true credentials which you have executed already because they want to know that you have involved in the work or not, most important thing is, when you are blanked with the question Accept that you are blanked in front of interviewer

Structural Engineer Interview Questions asked at other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of member was given. 2. Calculate force required for COG shift. W load was applied at center of rectangle and we had to calculate forces at all four corners to shift the cog. 3. SFD ... read more
View answer (2)

I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All types of questions about stressing
Round 3 - HR 

(1 Question)

  • Q1. Checking your communication skills and documents

Interview Preparation Tips

Interview preparation tips for other job seekers - Mail your cv DBL hrs they will call you or mail you

Structural Engineer Interview Questions asked at other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of member was given. 2. Calculate force required for COG shift. W load was applied at center of rectangle and we had to calculate forces at all four corners to shift the cog. 3. SFD ... read more
View answer (2)

I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared your last experience .. be loyel .. interview will be smooth

Senior Supervisor Interview Questions asked at other Companies

Q1. What is standard height between WC Outlet centre to Inlet center?
View answer (1)

Dilip Buildcon interview questions for popular designations

 Highway Engineer

 (6)

 Senior Engineer

 (4)

 Asst Store

 (4)

 Surveyor

 (4)

 Senior Engineer Mechanical

 (3)

 Store Executive

 (3)

 Structural Engineer

 (3)

 Site Engineer

 (3)

I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About myself , my previous employer
  • Q2. My family background
Round 3 - Technical 

(2 Questions)

  • Q1. About my previous company job responsibilities
  • Q2. About my working knowledge

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Quantity Surveyor interview:
  • Technical Skills
Interview preparation tips for other job seekers - Good experience about interview with HR & technical round

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Get interview-ready with Top Dilip Buildcon Interview Questions

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Why you are interested to join this company.
Round 2 - Technical 

(3 Questions)

  • Q1. Why we use ventilation in tunneling work.
  • Ans. 

    Ventilation is necessary in tunneling work to ensure the safety and health of workers.

    • To remove harmful gases and fumes from the tunnel

    • To control the temperature and humidity levels

    • To provide fresh air for workers to breathe

    • To prevent the buildup of dust and debris

    • To maintain proper air pressure inside the tunnel

    • Examples: subway tunnels, mining tunnels, road tunnels

  • Answered by AI
  • Q2. Which drill machine you have at your site.
  • Ans. 

    We have a Bosch 500W drill machine at our site.

    • We use a Bosch 500W drill machine for drilling holes in metal and wood.

    • The drill machine has a variable speed control and a keyless chuck.

    • It is lightweight and easy to handle, making it ideal for our needs.

    • We also have a set of drill bits for different sizes and materials.

    • The drill machine has been reliable and efficient for our projects.

  • Answered by AI
  • Q3. Difference between T-CAD & I-SURE.
  • Ans. 

    T-CAD is a software used for simulating semiconductor devices while I-SURE is a software used for reliability analysis.

    • T-CAD is used for simulating the behavior of semiconductor devices under different conditions.

    • I-SURE is used for reliability analysis of electronic systems.

    • T-CAD helps in designing and optimizing semiconductor devices.

    • I-SURE helps in predicting the failure rate of electronic systems.

    • T-CAD is used in th...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Senior Engineer Mechanical interview:
  • Technical
Interview preparation tips for other job seekers - jobs are available,so concentrate your goal.try and catch it.

Senior Engineer Mechanical Interview Questions asked at other Companies

Q1. Few manufacturing process for sheet metal operations and when to use when in accordance to volume,lead time and cost balancing.
View answer (1)

Jobs at Dilip Buildcon

View all

I applied via Company Website

Interview Questionnaire 

1 Question

  • Q1. Vogele paver screed function & Temper / pressure bar applications, difference between Diesel Engine BS iv & BS VI.
  • Ans. 

    Answering questions on Vogele paver screed function and diesel engine BS iv & BS VI

    • Vogele paver screed function involves leveling and compacting asphalt or concrete surfaces

    • Temper/pressure bar applications involve adjusting the temperature and pressure of the screed to achieve desired results

    • BS IV and BS VI are emission standards for diesel engines, with BS VI being more stringent and requiring advanced technology to r...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - While sitting on interview prepare for the Basic knowledge about Machineries. Engine (Make & Model) , Hydraulic functions, Hydraulic Circuit, Power ( in Hp) etc which can build confidence to get sucess.

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Manager Interview Questions & Answers

user image Anonymous

posted on 21 Jul 2021

Interview Questionnaire 

1 Question

  • Q1. What is the procedure for the welding of different materials
  • Ans. 

    The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.

    • Identify the materials to be welded and determine the compatibility of their properties.

    • Select the appropriate welding method based on the materials and desired joint strength.

    • Prepare the materials by cleaning, removing any contaminants, and en...

  • Answered by AI

Manager Interview Questions asked at other Companies

Q1. There is a chairman of a conglomerate. He has been on the post for 10 years, and is extremely dominating. He treats the various business heads like children, not letting them take any major decision. While the chairman has negatives, he bel... read more
View answer (2)

I applied via Company Website and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Which materials use in construction?
  • Ans. 

    Various materials are used in construction including concrete, steel, wood, and glass.

    • Concrete is a commonly used material in construction due to its strength and durability.

    • Steel is often used for structural support in buildings and bridges.

    • Wood is used for framing and finishing in residential construction.

    • Glass is used for windows and facades, providing natural light and aesthetic appeal.

  • Answered by AI
  • Q2. What is the role of store executive?
  • Ans. 

    Store executives are responsible for managing the day-to-day operations of a retail store.

    • Overseeing sales and customer service

    • Managing inventory and stock levels

    • Hiring and training staff

    • Creating and implementing marketing strategies

    • Ensuring the store meets sales targets and profitability goals

  • Answered by AI
  • Q3. Types of pipes?
  • Ans. 

    There are various types of pipes used in different industries such as PVC, copper, steel, and cast iron.

    • PVC pipes are commonly used in plumbing and irrigation systems.

    • Copper pipes are used for water supply lines and HVAC systems.

    • Steel pipes are used for high-pressure applications such as gas and oil pipelines.

    • Cast iron pipes are used for drainage and sewage systems.

    • Other types of pipes include galvanized steel, polyeth

  • Answered by AI
  • Q4. What is plumbing?
  • Ans. 

    Plumbing is the system of pipes, fixtures, and fittings used for the distribution of water and gas in a building.

    • Plumbing involves the installation, repair, and maintenance of pipes, valves, faucets, and other fixtures.

    • It is used for the distribution of water and gas in residential, commercial, and industrial buildings.

    • Plumbers use various tools and techniques to diagnose and fix plumbing issues, such as leaks, clogs, ...

  • Answered by AI
  • Q5. What is insulation?
  • Ans. 

    Insulation is a material or technique used to prevent the transfer of heat, sound, or electricity.

    • Insulation is used to maintain a comfortable temperature inside buildings by reducing heat transfer.

    • It can also be used to reduce noise transmission between rooms or from outside sources.

    • Electrical insulation is used to prevent the flow of electricity and ensure safety in electrical systems.

    • Common insulation materials incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - We know the basics of materials and in which purpose we use the different types of materials.

Top Dilip Buildcon Store Executive Interview Questions and Answers

Q1. Which materials use in construction?
View answer (6)

Store Executive Interview Questions asked at other Companies

Q1. How to measure the materials like steel and metal
View answer (10)

I applied via Company Website and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Share details of your previous job.
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Safety Engineer interview:
  • Fire and safety
  • Industrial Safety
  • Construction Safety
Interview preparation tips for other job seekers - Believe in yourself and do smart work and ready for hardwork

Safety Engineer Interview Questions asked at other Companies

Q1. What is the safe distance of excavations from a a truck
View answer (6)

Dilip Buildcon Interview FAQs

How many rounds are there in Dilip Buildcon interview for experienced candidates?
Dilip Buildcon interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the Dilip Buildcon interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for Dilip Buildcon interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dilip Buildcon. The most common topics and skills that interviewers at Dilip Buildcon expect are Monitoring, Budgeting, General Management, Safety and Marketing.
What are the top questions asked in Dilip Buildcon interview for experienced candidates?

Some of the top questions asked at the Dilip Buildcon interview for experienced candidates -

  1. How many types of fire extinguisher how many types of sign board what is safe...read more
  2. What is the difference between a Quantity Surveyor and a Valu...read more
  3. 2) Can you work for purchase department and mechanical department to purcha...read more
How long is the Dilip Buildcon interview process?

The duration of Dilip Buildcon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Dilip Buildcon Interview Process for Experienced

based on 41 interviews

Interview experience

4
  
Good
View more

Fast track your campus placements

View all

Dilip Buildcon Reviews and Ratings

based on 2.4k reviews

4.0/5

Rating in categories

3.8

Skill development

3.7

Work-life balance

3.7

Salary

3.5

Job security

3.7

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 2.4k Reviews and Ratings
Quantity Surveyor - Building Construction

Bhopal

8-13 Yrs

₹ 5-12 LPA

Sr Engineer / Engineer - Fabrication

Bhopal,

Anantapur

5-10 Yrs

₹ 4-9 LPA

Engineer/SR Electrician/Electrician-stone crusher fix

Bangalore / Bengaluru

3-8 Yrs

₹ 3-7 LPA

Explore more jobs
Senior Engineer
212 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Asst Store
199 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
196 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
192 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
178 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Dilip Buildcon with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview