Filter interviews by
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
Yes, I have knowledge of civil execution.
I have experience in managing and overseeing the execution of civil engineering projects.
I am familiar with the processes and procedures involved in executing civil engineering designs.
I have worked on various civil construction projects where I was responsible for ensuring the proper execution of plans and specifications.
I have knowledge of construction materials, techniques, a...
Top trending discussions
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Experienced project manager with a proven track record of successfully leading cross-functional teams to deliver projects on time and within budget.
Over 5 years of project management experience
Strong leadership and communication skills
Proficient in project management tools such as Asana and Jira
Managed a team of 10+ members to launch a new product within deadline
Passion for sales and interest in real estate led me to pursue a career in both fields.
I have always had a passion for sales and enjoy the challenge of meeting targets and building relationships with clients.
Real estate appeals to me because of the opportunity to work in a dynamic industry where every day is different.
I am drawn to the potential for growth and success in both sales and real estate.
English, Maths, Logical reasoning
Agile methodology is a software development approach that emphasizes flexibility, collaboration, and incremental delivery.
Iterative approach to development
Frequent collaboration between team members and stakeholders
Adaptability to changing requirements
Delivering working software in short iterations
Scrum and Kanban are popular frameworks within agile methodology
posted on 10 Dec 2024
I applied via LinkedIn and was interviewed in Jun 2024. There was 1 interview round.
Experienced sales executive with a proven track record of exceeding targets and building strong client relationships.
Over 10 years of sales experience in the technology industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained relationships with key clients such as ABC Company and XYZ Corporation
Strong negotiation and communication skills
Led a team of sales representatives to increase o
I have a proven track record of exceeding sales targets and building strong relationships with clients.
I have consistently exceeded sales targets in my previous roles by implementing effective sales strategies.
I have a strong network of clients and contacts in the industry that I can leverage to drive sales.
I am a skilled negotiator and have successfully closed high-value deals in the past.
I am highly motivated and dri...
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
SBU is Strategic Business Unit, BU is Business Unit, and Carpet area is the total area of a building excluding walls and other non-usable spaces.
SBU is a standalone business entity within a larger organization, focusing on a specific market segment.
BU is a division or department within a company that operates independently but is still part of the larger organization.
Carpet area refers to the total usable area of a bui...
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
LD for column refers to Liquidated Damages for delay in completing the column construction.
LD stands for Liquidated Damages.
It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.
LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.
The LD amount is usually mentioned in the cont...
The mix ratio of M20 grade of concrete is 1:1.5:3.
The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.
For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.
This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.
For example, if you have 1 bag of cement (50 kg), you would need 1....
The unit weight of steel varies depending on its type and grade.
The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).
The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).
The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.
Clear cover is important to protect the reinforcement from corrosion and fire.
The clear cover for beams is typically specified in construction drawings or codes.
The clear cover can vary depending on the type of beam and its exposure conditions.
For example, in a residential building, the clear c...
The height of a parapet wall varies depending on its purpose and location.
The height of a parapet wall is typically determined by building codes and regulations.
In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.
In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.
Historical buildings ...
posted on 9 Aug 2023
The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.
Loss of structural integrity in packaging
Increased risk of contamination or tampering
Difficulty in handling and storage of products
Potential impact on product shelf life and quality
Need for alternative support measures or redesign of packaging
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.
Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.
The timing of pour strips will depend on the size and complexity of the pr...
Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.
Use adjustable props to support the slab and pourstrip while removing the shuttering.
Install beams to transfer the load from the slab to the props, allowing the supports to be removed.
Ensure proper alignment and spacing of props and beams to distribute the load evenly.
Regularly check and adjust the props and...
Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.
Perform slump test to ensure proper consistency of concrete
Check air content to ensure proper durability and workability
Monitor temperature to prevent issues like thermal cracking
At column and slab junction, check reinforcement p...
based on 14 reviews
Rating in categories
Planning Manager
5
salaries
| ₹5.7 L/yr - ₹7.5 L/yr |
Marketing Manager
4
salaries
| ₹6.5 L/yr - ₹7.4 L/yr |
Company Secretary
4
salaries
| ₹6.5 L/yr - ₹9.4 L/yr |
Executive Accountant
4
salaries
| ₹2 L/yr - ₹3.3 L/yr |
Quantity Surveyor
4
salaries
| ₹8 L/yr - ₹11.5 L/yr |
Balaji Enterprises
Mahaveer Group
Kashish Developers
Bhumika Group