I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
Individual's nature and behavior are crucial for success in any role.
Positive attitude towards work and colleagues
Good communication and interpersonal skills
Ability to work under pressure and meet deadlines
Attention to detail and accuracy
Adaptability and willingness to learn
Honesty and integrity
Professionalism and work ethics
posted on 3 Mar 2024
Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.
Calculate the surface area of the structure that needs formwork
Determine the type of formwork material to be used
Consider the complexity of the structure and any special requirements
Account for wastage and extra material for safety
Use standard formulas or software for accurate calculations
posted on 23 Nov 2022
Problems you've faced during construction
posted on 28 Jun 2022
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 11 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Client bills are submitted by verifying the services provided and charges incurred, generating an invoice, and sending it to the client.
Verify services provided and charges incurred
Generate invoice
Send invoice to client
Variations & extra items refer to additional charges or changes made to a standard billing item.
Variations can include changes in pricing due to location, time of day, or other factors.
Extra items can include additional services or products added to a standard billing item.
These charges are typically added on top of the standard billing item and can increase the overall cost.
Examples include a hotel charging extra for ...
posted on 1 Sep 2017
I was interviewed in Mar 2017.
Working hours of an equipment can be calculated by subtracting the start time from the end time.
Obtain the start time and end time of the equipment's operation.
Convert the start and end times to a common time format, such as hours and minutes.
Subtract the start time from the end time to calculate the duration of operation.
Consider any breaks or downtime during the operation and subtract them from the total duration.
The...
Depreciation is the decrease in the value of an asset over time due to wear and tear, obsolescence, or other factors.
Depreciation is a method used in accounting to allocate the cost of an asset over its useful life.
It represents the reduction in the value of an asset on the balance sheet.
Depreciation can be calculated using various methods such as straight-line, declining balance, or units of production.
Example: A comp...
The per hour cost of operating a batching plant depends on various factors such as the size of the plant, the type of materials being processed, and the labor and maintenance costs.
The size of the batching plant affects the operating cost. Larger plants generally have higher operating costs due to increased energy consumption and maintenance requirements.
The type of materials being processed also impacts the cost. Diff...
posted on 17 Mar 2024
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
Earth cutting as per CPWD norms involves following specific guidelines for excavation work.
CPWD norms specify the depth and width of excavation for different types of soil
The guidelines also include safety measures to be followed during earth cutting
Proper disposal of excavated material is also a key aspect of CPWD norms
Deductions in measurements include shrinkage, wastage, breakage, and spillage.
Shrinkage: Reduction in size or weight of materials during handling or storage.
Wastage: Loss of materials during the construction process.
Breakage: Damage to materials during transportation or handling.
Spillage: Accidental loss of materials due to spills or leaks.
posted on 31 Jul 2024
posted on 30 Jun 2024
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
posted on 29 May 2023
I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.
based on 4 reviews
Rating in categories
Senior Engineer
164
salaries
| ₹4 L/yr - ₹9.1 L/yr |
Assistant Manager
97
salaries
| ₹5.8 L/yr - ₹12 L/yr |
Civil Site Engineer
66
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Civil Engineer
57
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Junior Engineer
52
salaries
| ₹2 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Nagarjuna Construction Company