There is no formula for carnal slope slant.
Carnal slope slant is not a recognized term in engineering or mathematics.
It is possible that the interviewer made a mistake or was testing the candidate's ability to handle unexpected questions.
The candidate can politely ask for clarification or context if they are unsure how to answer a question.
It is important to be honest and transparent about one's knowledge and expertise
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
posted on 3 Feb 2023
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Basic questions related quality control
Shuttering requirement can be calculated by determining the surface area to be covered and the type of material to be used.
Calculate the surface area of the structure to be shuttered
Determine the type and size of the material to be used for shuttering
Consider the number of repetitions of the same type of shuttering required for the project
Factor in any additional requirements such as corners, edges, or special shapes
Ca...
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
based on 4 reviews
Rating in categories
Site Engineer
51
salaries
| ₹1.5 L/yr - ₹4.1 L/yr |
Civil Site Engineer
41
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
27
salaries
| ₹3.6 L/yr - ₹6.3 L/yr |
Junior Engineer
20
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Accounts Officer
13
salaries
| ₹2.7 L/yr - ₹5.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company