Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
A motor is a device that converts electrical energy into mechanical energy to perform work.
Motors are commonly used in various applications such as electric vehicles, industrial machinery, and household appliances.
They come in different types such as AC motors, DC motors, and stepper motors.
Motor capacity refers to its power rating, typically measured in horsepower (HP) or kilowatts (kW).
Higher capacity motors can gene...
I applied via Company Website and was interviewed before Dec 2022. There were 4 interview rounds.
I am an experienced Electrical Engineer with a passion for designing and implementing innovative solutions.
I have a strong background in electrical engineering, with a focus on power systems and control systems.
I have successfully designed and implemented electrical systems for various projects, including commercial buildings and industrial plants.
I am skilled in using CAD software for electrical design and have experi...
I can provide the required documents and discuss salary and joining details.
I can provide all necessary documents such as resume, certifications, and transcripts.
My current base salary is $X per year.
I expect a base salary in the range of $Y to $Z per year.
I am available to join within X weeks/months.
I can discuss further details during the interview.
posted on 13 Sep 2022
I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.
posted on 3 Jul 2021
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
Types of cables include coaxial, twisted pair, fiber optic, and ribbon cables.
Coaxial cables are used for high-frequency transmission and have a central conductor surrounded by insulation and a shield.
Twisted pair cables are commonly used for Ethernet networks and consist of two insulated copper wires twisted together.
Fiber optic cables use light to transmit data and are used for long-distance communication.
Ribbon cabl...
Conductors are materials that allow electric current to flow through them. There are different types of conductors.
Metallic conductors (copper, aluminum, silver, gold, etc.)
Non-metallic conductors (graphite, silicon, etc.)
Superconductors (materials that have zero electrical resistance at very low temperatures)
Semiconductors (materials that have intermediate conductivity)
Ionic conductors (materials that conduct electric
Joints are used to connect two or more electrical conductors together.
Joints are used to extend the length of a conductor.
They are also used to repair a broken conductor.
Joints can be made using various methods such as soldering, crimping, or using connectors.
Proper insulation must be used to prevent short circuits and ensure safety.
Joints should be made with care to ensure good electrical conductivity and avoid resist...
Materials are inspected using various techniques such as visual inspection, testing, and quality control measures.
Visual inspection involves examining materials for any visible defects or abnormalities.
Testing methods include conducting electrical, mechanical, and chemical tests to ensure the materials meet specifications.
Quality control measures involve monitoring and evaluating the materials throughout the production...
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is used in construction projects to estimate the cost of materials, labor, and equipment.
It lists all the items needed for the project, along with their quantities and prices.
BOQ helps in budgeting and cost control during the project.
It is prepared by a quantity surveyor or an ...
Interview experience
Site Engineer
53
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Civil Site Engineer
41
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
29
salaries
| ₹3.6 L/yr - ₹7.1 L/yr |
Junior Engineer
22
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Accounts Officer
13
salaries
| ₹2.7 L/yr - ₹5.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company