I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Main question will be on structures bases and finding quantity of shuttering, concrete, and some software like autocad, revit related basic questions

Round 3 - Technical 

(2 Questions)

  • Q1. Learn basic of software tools like autocad,revit and mostly excel
  • Q2. When come to pure cire be prepare with concept of reinforcement,types of curing,density if steel, labouratry test like initial and final setting of cement,slump cone test,many more

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare before interview regarding your resume, the company background,and technical question
Mostly question will comes related to which type of work the company will deal.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What do you know about bar bending schedule.
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars, their shape, size, length, and quantity required for construction.

    • It is used by civil engineers and contractors for estimating the amount of steel required for a construction project.

    • It includes information about the diameter, length, and shape of each bar, as well as the number of bars required for each section of the structure.

    • It he...

  • Answered by AI
  • Q2. Prepare a bar bending schedule for footing .
  • Ans. 

    A bar bending schedule is a document that provides details of reinforcement steel bars, their shape, size, quantity, and placement in a concrete structure.

    • Determine the size and shape of the footing

    • Calculate the total length of steel required for the footing

    • Determine the spacing and diameter of the steel bars

    • Prepare a detailed drawing of the footing with the steel bars marked

    • List the steel bars in a table with their si

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give your 100% best. Don't take tension. Answer every question confidently.

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Junior Engineer Civil interview:
  • Civil Engineering
  • Pile Foundation
  • Stone column
  • Steel fabricated
  • Send column
Interview preparation tips for other job seekers - My interview lasted 40 minutes and all the questions were asked. Three people attended this interview for me regarding my work.So after asking all the questions in my interview and writing the answer to it for me

Interview Questionnaire 

2 Questions

  • Q1. What cutting size of playe for making shuttering bord for column size 1mtr×1mtr?
  • Ans. 

    The cutting size of the plate for making shuttering board for a column size of 1m x 1m is not provided.

    • The cutting size of the plate depends on the thickness of the shuttering board.

    • The thickness of the shuttering board is determined based on the load and requirements of the column.

    • The cutting size can be calculated by subtracting the thickness of the shuttering board from the column size.

    • Without the specific thickness...

  • Answered by AI
  • Q2. Tolerance for reinforcement bar spacing in slab for above 200mm thick?
  • Ans. 

    Tolerance for reinforcement bar spacing in slab for above 200mm thick?

    • The tolerance for reinforcement bar spacing in slab for above 200mm thick is +/- 10mm.

    • This is to ensure proper distribution of load and prevent cracks.

    • The spacing should not exceed 3 times the diameter of the bar.

    • The tolerance may vary depending on the design and specifications of the project.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(7 Questions)

  • Q1. What is your current workplace?
  • Q2. What is your experience in this field?
  • Q3. How do you handle a site in the transmission sector?
  • Q4. What are the key considerations for the foundation in transmission line construction?
  • Q5. What is the best method for erection in transmission?
  • Q6. How do you adapt to various challenging situations?
  • Q7. What is the role of the diagonal in the transmission sector?

Interview Preparation Tips

Interview preparation tips for other job seekers - You should prepare for work by acquiring knowledge about all the processes in this field, including any difficulties or problems related to this transmission line.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Finishing work details
  • Q2. Tiles work, plaster work,MEP WORK
  • Q3. Falscilingwork,paint work
  • Q4. Layout works,coloumn,slab,beam, footing
  • Q5. RCC work, structural drawing knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical skill, finishing work details
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. How to control quality.
  • Ans. 

    Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.

    • Establishing quality control procedures and protocols

    • Regular inspections and testing of materials and workmanship

    • Training and educating staff on quality standards

    • Implementing corrective actions when deviations are identified

    • Utilizing quality control tools such as checklists

  • Answered by AI
  • Q2. What is BBS is code.
  • Ans. 

    BBS in code refers to Bar Bending Schedule as per Indian standards.

    • BBS stands for Bar Bending Schedule.

    • It is a detailed list of reinforcement bars to be used in a construction project.

    • It includes information on bar sizes, shapes, quantities, and placement.

    • BBS is prepared as per the requirements of Indian standards like IS 2502:1963.

    • It helps in ensuring proper reinforcement placement and quantity in the structure.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

Bsr Infratech India Interview FAQs

How many rounds are there in Bsr Infratech India Junior Engineer Civil interview?
Bsr Infratech India interview process usually has 1 rounds. The most common rounds in the Bsr Infratech India interview process are Technical.

Tell us how to improve this page.

Bsr Infratech India Junior Engineer Civil Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Bsr Infratech India Junior Engineer Civil Salary
based on 11 salaries
₹2.2 L/yr - ₹3 L/yr
21% less than the average Junior Engineer Civil Salary in India
View more details

Bsr Infratech India Junior Engineer Civil Reviews and Ratings

based on 2 reviews

3.7/5

Rating in categories

4.7

Skill development

3.3

Work-life balance

2.3

Salary

4.7

Job security

2.8

Company culture

2.7

Promotions

4.5

Work satisfaction

Explore 2 Reviews and Ratings
Site Engineer
53 salaries
unlock blur

₹1.5 L/yr - ₹4.3 L/yr

Civil Site Engineer
41 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
29 salaries
unlock blur

₹3.6 L/yr - ₹7.1 L/yr

Junior Engineer
22 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Accounts Officer
13 salaries
unlock blur

₹2.7 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Bsr Infratech India with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview