Bar bending schedule is a document that provides details of reinforcement steel bars, their shape, size, length, and quantity required for construction.
It is used by civil engineers and contractors for estimating the amount of steel required for a construction project.
It includes information about the diameter, length, and shape of each bar, as well as the number of bars required for each section of the structure.
It he...
A bar bending schedule is a document that provides details of reinforcement steel bars, their shape, size, quantity, and placement in a concrete structure.
Determine the size and shape of the footing
Calculate the total length of steel required for the footing
Determine the spacing and diameter of the steel bars
Prepare a detailed drawing of the footing with the steel bars marked
List the steel bars in a table with their si
Top trending discussions
posted on 1 Feb 2022
I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.
posted on 25 Mar 2022
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
posted on 20 Jan 2023
I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Main question will be on structures bases and finding quantity of shuttering, concrete, and some software like autocad, revit related basic questions
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.
Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.
Retaining walls are used to hold back soil and prevent it from sliding or eroding.
Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.
Retaining walls can be made of v...
Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.
Plywood is the most commonly used material for shuttering due to its durability and affordability.
Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.
Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.
Plastic is a cost-effective option for simple construction pro...
Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.
Calculate the total length of steel required
Determine the spacing between the bars
Prepare a detailed bar bending schedule
To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.
Measure the length, width, and height of the trapezoidal footing
Calculate the area of the trapezoidal base using the formula (a+b)/2 * h
Calculate the volume of the trapezoidal prism using the formula area of base * height
Multiply the volume by the number of trapezoidal footings needed
Add an additi
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.
About any road ways and types of bridges and classification of is codes for building construction
About any road ways and classification of turnouts.
based on 45 reviews
Rating in categories
Junior Engineer Civil
317
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Junior Engineer
175
salaries
| ₹1.7 L/yr - ₹7.1 L/yr |
Assistant Engineer
106
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Assistant Engineer - Civil
92
salaries
| ₹3 L/yr - ₹7.1 L/yr |
Senior Engineer
81
salaries
| ₹4.5 L/yr - ₹10 L/yr |
L&T Energy Hydrocarbon
AECOM
Sam Higginbottom Institute of Agriculture, Technology and Sciences
Apco Infratech