Filter interviews by
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
WI stands for Work Instruction, which is a detailed document that provides step-by-step instructions on how to perform a specific task or job.
Work Instructions are used to ensure consistency in processes and quality of output.
They typically include information such as materials needed, tools required, safety precautions, and specific steps to be followed.
Examples of Work Instructions include assembly instructions for a...
Cycle time production calculation is the total time it takes to produce one unit of a product.
Cycle time is calculated by dividing the total production time by the total number of units produced.
For example, if it takes 10 hours to produce 100 units, the cycle time would be 0.1 hours per unit.
Cycle time helps in identifying bottlenecks and improving efficiency in production processes.
FTT stands for First Time Through, a metric used to measure the percentage of products that pass inspection on the first attempt.
FTT is calculated by dividing the number of products that pass inspection on the first attempt by the total number of products inspected, then multiplying by 100 to get a percentage.
FTT is an important metric for measuring the efficiency and quality of production processes.
For example, if 90 ...
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of a manufacturing process.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
For example, if a machine is available 90% of the time, operates at 80% of its maximum speed, and produces good parts 95% of the time, the OEE woul
5s explaintion, what about kizen, TPM , 7QC tool, 8D ?
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
Borgwarner Emission System interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Dec 2022. There was 1 interview round.
Our future plans for the carrier involve expanding our operations globally and implementing advanced technology for improved efficiency.
Expanding operations globally to reach new markets
Implementing advanced technology for improved efficiency
Investing in employee training and development
Enhancing customer service and satisfaction
Exploring strategic partnerships and collaborations
The focus points in process include efficiency, quality, cost reduction, and continuous improvement.
Efficiency: Streamlining processes to minimize waste and maximize productivity.
Quality: Ensuring that processes meet or exceed customer expectations.
Cost reduction: Identifying and implementing strategies to reduce expenses without compromising quality.
Continuous improvement: Regularly evaluating and refining processes t
I applied via Naukri.com and was interviewed before Apr 2022. There were 4 interview rounds.
It’s a telephonic interview with HR team included with sone technical basic knowledge
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the Borgwarner Emission System interview -
based on 16 interviews
Interview experience
based on 210 reviews
Rating in categories
Software Engineer
71
salaries
| ₹6 L/yr - ₹20.8 L/yr |
Technical Lead
53
salaries
| ₹14.2 L/yr - ₹30 L/yr |
Senior Software Engineer
50
salaries
| ₹9 L/yr - ₹20 L/yr |
Senior Engineer
37
salaries
| ₹7.2 L/yr - ₹20.6 L/yr |
Assistant Manager
35
salaries
| ₹9.5 L/yr - ₹16.5 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
ZF Commercial Vehicle Control Systems