i
Bajaj Electricals
Filter interviews by
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
Insulation
Insulate the panel
Use protective covers
Ensure proper grounding
Regular maintenance
UG cable laying process involves trenching, cable pulling, jointing, and testing.
Trenching is done to create a path for the cable and ensure proper depth
Cable pulling involves laying the cable in the trench and securing it with clamps
Jointing is done to connect two cables together using connectors and insulators
Testing is done to ensure the cable is properly installed and functioning
Criteria for UG cable laying include...
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Jan 2024. There were 4 interview rounds.
C coding questions on bitwise concepts
DSA coding concepts
The number of complete squares inscribed in a circle can be calculated using a formula based on the number of sides of the square.
The formula to calculate the number of complete squares inscribed in a circle is n*(n+1)*(2n+1)/6, where n is the number of sides of the square.
For example, if the circle has a square with 4 sides inscribed in it, the number of complete squares would be 30 (4*(4+1)*(2*4+1)/6 = 30).
Increasing product efficiency can be achieved through optimizing processes, improving technology, and enhancing employee skills.
Optimize production processes to eliminate waste and improve workflow
Upgrade technology to automate tasks and improve accuracy
Provide training and development opportunities for employees to enhance their skills and knowledge
I would improve the user interface to enhance user experience and streamline navigation.
Enhance user interface design for better usability
Streamline navigation to improve user experience
Implement user feedback to make necessary changes
Optimize performance for faster loading times
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Time management is the process of planning and organizing how to divide your time between specific activities.
Setting goals and priorities
Creating a schedule or to-do list
Eliminating distractions
Prioritizing tasks based on importance and deadlines
Allocating time for each task
Using tools like calendars and reminders
Regularly reviewing and adjusting your schedule
I applied via Recruitment Consulltant and was interviewed before Jan 2021. There were 4 interview rounds.
Generic leetcode easy medium
posted on 11 May 2024
I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
posted on 11 Apr 2022
based on 67 reviews
Rating in categories
Assistant Manager
273
salaries
| ₹5.4 L/yr - ₹14.7 L/yr |
Senior Engineer
235
salaries
| ₹3.4 L/yr - ₹8.6 L/yr |
Trade Sales Manager
210
salaries
| ₹5.5 L/yr - ₹15.8 L/yr |
Deputy Manager
203
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Territory Head
190
salaries
| ₹3.8 L/yr - ₹11.4 L/yr |
Havells
Crompton Greaves Consumer Electricals
V-Guard Industries
Symphony