Filter interviews by
I was interviewed before Feb 2024.
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
Poka yoke is a Japanese term for mistake-proofing or error-proofing.
It is a technique used to prevent errors from occurring during a process.
It involves designing a process or product in a way that makes it impossible or difficult to make mistakes.
Examples include using color coding, shapes, or sensors to prevent errors.
Poka yoke can improve quality, reduce costs, and increase efficiency.
CAPA stands for Corrective and Preventive Action. It is a process used to identify, investigate, and resolve quality issues.
CAPA is a quality management system tool used to address and prevent problems
It involves identifying the root cause of a problem and implementing corrective and preventive actions
CAPA is an ongoing process that requires continuous monitoring and improvement
Examples of CAPA include implementing new...
Scrap refers to any material or product that is deemed unusable or defective.
Scrap can be generated during manufacturing processes when a product does not meet quality standards.
It can also refer to excess or leftover materials that cannot be used in production.
Scrap can be recycled or sold for its raw materials.
Examples of scrap include defective parts, excess packaging materials, and leftover metal shavings.
Vernier caliper and micrometer are both precision measuring instruments, but they differ in their design and measurement range.
Vernier caliper measures both internal and external dimensions with a range of 0-150mm or 0-6 inches.
Micrometer measures thickness or outside dimensions with a range of 0-25mm or 0-1 inch.
Vernier caliper uses a sliding scale and a vernier scale for measurement, while micrometer uses a screw mec...
PPM stands for parts per million. It is a unit of measurement used to express the concentration of a substance in a solution.
PPM is calculated by dividing the number of parts of a substance by the total number of parts in the solution and multiplying by one million.
Formula: PPM = (Number of parts of substance / Total number of parts in solution) * 1,000,000
For example, if there are 10 parts of a substance in a solution...
The seven QC tools are a set of quality control tools used to identify and solve quality-related issues in manufacturing processes.
The seven QC tools are: check sheets, histograms, Pareto charts, cause-and-effect diagrams, control charts, scatter diagrams, and flowcharts.
Check sheets are used to collect data and record occurrences of specific events or defects.
Histograms are graphical representations of data distributi...
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
Automotive Manufacturers interview questions for designations
Top trending discussions
posted on 7 Dec 2024
My problem solving process involves identifying the issue, analyzing potential solutions, implementing a plan, and evaluating the results.
Identify the problem by gathering information and defining the root cause
Analyze potential solutions by brainstorming, researching, and evaluating each option
Implement a plan by selecting the best solution and creating a detailed action plan
Evaluate the results by monitoring the outc...
I was interviewed in Jul 2024.
60 minutes mechanical engineering topic thermal, som, heat transfer
Ev in day today life
Production issue of material holes could be due to manufacturing defects, improper handling, or design flaws.
Possible manufacturing defects in the material causing holes
Improper handling during production leading to holes in the material
Design flaws in the production process resulting in material holes
Issues with materials are solved by identifying root causes, implementing corrective actions, and conducting thorough testing.
Identify the root cause of the issue with the material
Implement corrective actions to address the root cause
Conduct thorough testing to ensure the issue is resolved
Document the process and lessons learned for future reference
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
There are several types of gears, including spur gears, helical gears, bevel gears, worm gears, rack and pinion gears, and planetary gears.
Spur gears have straight teeth and are the most common type of gear.
Helical gears have angled teeth for smoother operation.
Bevel gears have cone-shaped teeth and are used to change the direction of rotation.
Worm gears have a screw-like appearance and are used for high torque applica...
There are two main types of engines: internal combustion engines and external combustion engines.
Internal combustion engines: fuel is burned inside the engine to produce power (e.g. gasoline engines, diesel engines)
External combustion engines: fuel is burned outside the engine to produce power (e.g. steam engines)
Vernier and micrometer are precision measuring tools used in engineering to measure small distances accurately.
Vernier caliper is a measuring instrument with a main scale and a sliding vernier scale for more precise measurements.
Micrometer screw gauge is used for even more accurate measurements, typically to the nearest thousandth of an inch or hundredth of a millimeter.
The least count of a vernier caliper is usually 0...
posted on 7 Aug 2024
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
My goal for my annual performance is to exceed all quality metrics, improve processes, and contribute to the overall success of the team.
Achieve 100% compliance with quality standards
Implement process improvements to increase efficiency
Collaborate with team members to achieve common goals
My short term goal is to obtain my Six Sigma Green Belt certification within the next 6 months.
Obtain Six Sigma Green Belt certification within 6 months
Improve problem-solving skills
Enhance knowledge of quality management techniques
I handle quality improvement by analyzing data, identifying root causes of issues, implementing corrective actions, and monitoring results.
Analyze data to identify trends and patterns
Use tools like Six Sigma or Lean methodologies to improve processes
Implement corrective actions based on root cause analysis
Monitor results to ensure sustained improvement
Collaborate with cross-functional teams to drive quality initiatives
Production by 1 year refers to the total output or manufacturing of a product within a one-year time frame.
Production by 1 year is the amount of goods or services produced by a company in a 12-month period.
It is a key metric used to measure the efficiency and effectiveness of a production process.
Factors such as demand, resources, and technology can impact production by 1 year.
For example, a car manufacturer may aim to...
Quality is important because it ensures customer satisfaction, reduces costs, and improves reputation.
Ensures customer satisfaction by delivering products/services that meet or exceed expectations
Reduces costs by minimizing defects and rework
Improves reputation by building trust with customers and stakeholders
Helps in meeting regulatory requirements and standards
Leads to continuous improvement and innovation
Examples: T...
based on 2 interviews
Interview experience
based on 12 reviews
Rating in categories
Assistant Manager
165
salaries
| ₹2.9 L/yr - ₹11 L/yr |
Quality Engineer
138
salaries
| ₹1.2 L/yr - ₹5.2 L/yr |
Sales Executive
135
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Executive Accountant
108
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Production Engineer
95
salaries
| ₹1.3 L/yr - ₹5.5 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland