i
Aparna Constructions and Estates
Filter interviews by
I applied via Walk-in and was interviewed in Jan 2022. There was 1 interview round.
The question is unclear and does not make sense.
The question needs to be rephrased or clarified.
It is not clear what is meant by 'site point one side shuttering' or 'which technique assemble'.
Without more information, it is impossible to provide a meaningful answer.
Innovative techniques like continuous casting and electric arc furnace were implemented to prevent steel corrosion.
Continuous casting technique was introduced to produce high-quality steel with fewer impurities.
Electric arc furnace technique was implemented to recycle scrap steel and reduce the need for raw materials.
Various coatings and treatments were applied to prevent steel corrosion.
Advanced monitoring systems wer...
DWG PT works can be studied through various cases.
Study the use of DWG PT in architectural designs
Analyze the impact of DWG PT on construction timelines
Examine the cost-effectiveness of using DWG PT in construction projects
Compare the performance of DWG PT with other construction materials
Investigate the durability of DWG PT in different environmental conditions
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
posted on 28 Sep 2021
based on 2 reviews
Rating in categories
Assistant Engineer
194
salaries
| ₹2.5 L/yr - ₹6.4 L/yr |
Junior Engineer
107
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Senior Engineer
97
salaries
| ₹4.2 L/yr - ₹9.2 L/yr |
Engineer
86
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF