I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 2 interview rounds.
Manu details (Daal makhani ,daal tadka , kadhai panir & Chicken, Mutton rogan joos , biryani , Alfredo pasta , Charmula Grill Chicken, BBK chicken wings, Arebita pasta , agli olio pasta , Grill Fish lemon butter shows, Hunter Chicken, Grill Prawn type )
Food safety ( food contamination)
Food westes / food spoilez
Food contamination is the presence of harmful substances or microorganisms in food, making it unsafe for consumption.
Occurs when food comes into contact with bacteria, viruses, parasites, chemicals, or foreign objects
Can happen during production, processing, storage, or preparation of food
Examples include E. coli in undercooked ground beef, salmonella in raw eggs, or chemicals in contaminated water
Can lead to foodborne
HACCP in kitchen stands for Hazard Analysis and Critical Control Points, a systematic preventive approach to food safety.
HACCP is a management system in which food safety is addressed through the analysis and control of biological, chemical, and physical hazards from raw material production, procurement and handling, to manufacturing, distribution and consumption of the finished product.
It involves identifying potentia...
Top trending discussions
posted on 27 Jan 2025
posted on 26 Oct 2024
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Plate weight can be calculated by multiplying the area of the plate by its density.
Calculate the area of the plate by multiplying its length and width.
Determine the density of the material of the plate.
Multiply the area by the density to get the weight of the plate.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
Calculate the total production time, including setup time, processing time, and downtime.
Determine the total number of units produced during that time period.
Divide the total production time by the total number of units produced to get the cycle time.
Cycle Time = Total Production Time / Total Number of Units Produce
posted on 30 May 2024
posted on 4 May 2024
I applied via campus placement at Sardar Vallabhbhai National Institute of Technology (NIT), Surat and was interviewed in Apr 2024. There were 2 interview rounds.
It consists of electronics and electrical core based question
posted on 24 Apr 2024
I applied via campus placement at Lovely Professional University (LPU) and was interviewed in Mar 2024. There were 3 interview rounds.
posted on 27 Mar 2024
based on 2 interviews
Interview experience
based on 13 reviews
Rating in categories
Specialist
4
salaries
| ₹35 L/yr - ₹45 L/yr |
IT Project Manager
3
salaries
| ₹5.3 L/yr - ₹10 L/yr |
GMR Group
Gvk Power & Infrastructure
Bengal Aerotropolis Projects
Airports Authority of India