i
Rudrabhishek Enterprises
Filter interviews by
I was interviewed in Apr 2022.
I applied via Naukri.com and was interviewed in Apr 2022. There was 1 interview round.
Rudrabhishek Enterprises interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I have 10 years of experience in water supply and have successfully managed multiple sites and teams of engineers.
I have 10 years of experience in water supply.
I have managed multiple sites and teams of engineers.
I have a proven track record of successfully coordinating water supply projects.
I am familiar with the challenges and requirements of managing sites and engineers in the water supply industry.
I have implemente...
The cover used for UPVC water distribution pipes is typically made of a durable and corrosion-resistant material.
The cover is designed to protect the pipe from external elements and prevent any damage or contamination.
It is usually made of UPVC (Unplasticized Polyvinyl Chloride) material, which is known for its strength and longevity.
The cover is securely fitted over the pipe to ensure a tight seal and prevent any leak...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
I applied via Referral and was interviewed in Oct 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Various documents need to be maintained at the PMC office.
Project proposals and contracts
Budget and financial reports
Meeting minutes and agendas
Employee records and HR documents
Project progress reports
Legal and regulatory documents
Correspondence and communication records
Inventory and asset management records
Project controlling is exercised through monitoring, measuring, and adjusting project activities to ensure they align with project goals.
Project controlling involves setting up a project plan with clear goals and objectives.
Regular monitoring and measurement of project activities against the plan is necessary.
Adjustments are made to the project plan as needed to ensure alignment with project goals.
Project controlling a...
The limits of deviation of BOQ quantities as per CPWD norms depend on the type of work and range from -5% to +10%.
The limits of deviation are specified in the CPWD Manual.
For civil works, the limit of deviation is -5% to +10%.
For electrical and mechanical works, the limit of deviation is -10% to +15%.
For interior works, the limit of deviation is -10% to +20%.
The limits of deviation may vary depending on the type of wor...
Mivan shuttering has limitations in terms of design flexibility and cost-effectiveness.
Mivan shuttering is not suitable for complex designs or irregular shapes.
It requires skilled labor and specialized equipment, which can increase the overall cost.
It may not be suitable for small-scale projects due to the high initial investment.
It may not be suitable for projects with limited space or difficult access.
It may not be s...
CPWD norms for working space area for calculating earthworm quantity in excavation of basement
CPWD recommends a working space area of 1.5 times the depth of excavation for calculating earthworm quantity
For example, if the depth of excavation is 2 meters, the working space area should be 3 meters
This calculation is important for determining the amount of organic matter in the soil and the need for soil improvement
CPWD g...
Top trending discussions
Interview experience
based on 172 reviews
Rating in categories
Assistant Manager
19
salaries
| ₹4.8 L/yr - ₹8 L/yr |
BIM Coordinator
15
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Site Engineer
13
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Senior Executive
10
salaries
| ₹3.5 L/yr - ₹6.7 L/yr |
Civil Site Engineer
8
salaries
| ₹3.5 L/yr - ₹4.2 L/yr |
TCS
Infosys
Wipro
HCLTech