I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Various documents need to be maintained at the PMC office.
Project proposals and contracts
Budget and financial reports
Meeting minutes and agendas
Employee records and HR documents
Project progress reports
Legal and regulatory documents
Correspondence and communication records
Inventory and asset management records
Project controlling is exercised through monitoring, measuring, and adjusting project activities to ensure they align with project goals.
Project controlling involves setting up a project plan with clear goals and objectives.
Regular monitoring and measurement of project activities against the plan is necessary.
Adjustments are made to the project plan as needed to ensure alignment with project goals.
Project controlling a...
The limits of deviation of BOQ quantities as per CPWD norms depend on the type of work and range from -5% to +10%.
The limits of deviation are specified in the CPWD Manual.
For civil works, the limit of deviation is -5% to +10%.
For electrical and mechanical works, the limit of deviation is -10% to +15%.
For interior works, the limit of deviation is -10% to +20%.
The limits of deviation may vary depending on the type of wor...
Mivan shuttering has limitations in terms of design flexibility and cost-effectiveness.
Mivan shuttering is not suitable for complex designs or irregular shapes.
It requires skilled labor and specialized equipment, which can increase the overall cost.
It may not be suitable for small-scale projects due to the high initial investment.
It may not be suitable for projects with limited space or difficult access.
It may not be s...
CPWD norms for working space area for calculating earthworm quantity in excavation of basement
CPWD recommends a working space area of 1.5 times the depth of excavation for calculating earthworm quantity
For example, if the depth of excavation is 2 meters, the working space area should be 3 meters
This calculation is important for determining the amount of organic matter in the soil and the need for soil improvement
CPWD g...
Top trending discussions
posted on 11 Nov 2021
Assistant Manager
19
salaries
| ₹4.8 L/yr - ₹8 L/yr |
BIM Coordinator
15
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Site Engineer
13
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Senior Executive
10
salaries
| ₹3.5 L/yr - ₹6.7 L/yr |
Civil Site Engineer
8
salaries
| ₹3.5 L/yr - ₹4.2 L/yr |
TCS
Infosys
Wipro
HCLTech