Q1. Which documents needs to be maintained at PMC office?
Various documents need to be maintained at the PMC office.
Project proposals and contracts
Budget and financial reports
Meeting minutes and agendas
Employee records and HR documents
Project progress reports
Legal and regulatory documents
Correspondence and communication records
Inventory and asset management records
Q2. What are the limits of deviation of BOQ quantities as per CPWD norms?
The limits of deviation of BOQ quantities as per CPWD norms depend on the type of work and range from -5% to +10%.
The limits of deviation are specified in the CPWD Manual.
For civil works, the limit of deviation is -5% to +10%.
For electrical and mechanical works, the limit of deviation is -10% to +15%.
For interior works, the limit of deviation is -10% to +20%.
The limits of deviation may vary depending on the type of work and location.
The contractor is responsible for ensuring ...read more
Q3. What are the limitations of mivan shuttering?
Mivan shuttering has limitations in terms of design flexibility and cost-effectiveness.
Mivan shuttering is not suitable for complex designs or irregular shapes.
It requires skilled labor and specialized equipment, which can increase the overall cost.
It may not be suitable for small-scale projects due to the high initial investment.
It may not be suitable for projects with limited space or difficult access.
It may not be suitable for projects with varying floor heights or irregul...read more
Q4. CPWD norms for working space area for calculating earthworm quantity in excavation of basement
CPWD norms for working space area for calculating earthworm quantity in excavation of basement
CPWD recommends a working space area of 1.5 times the depth of excavation for calculating earthworm quantity
For example, if the depth of excavation is 2 meters, the working space area should be 3 meters
This calculation is important for determining the amount of organic matter in the soil and the need for soil improvement
CPWD guidelines also recommend a minimum working space area of 3...read more
Q5. How project controlling is exercised?
Project controlling is exercised through monitoring, measuring, and adjusting project activities to ensure they align with project goals.
Project controlling involves setting up a project plan with clear goals and objectives.
Regular monitoring and measurement of project activities against the plan is necessary.
Adjustments are made to the project plan as needed to ensure alignment with project goals.
Project controlling also involves risk management, issue management, and change...read more
Q6. What is your total experience in WATER SUPPLY and can you manage the sites and engineers under you.
I have 10 years of experience in water supply and have successfully managed multiple sites and teams of engineers.
I have 10 years of experience in water supply.
I have managed multiple sites and teams of engineers.
I have a proven track record of successfully coordinating water supply projects.
I am familiar with the challenges and requirements of managing sites and engineers in the water supply industry.
I have implemented efficient project management strategies to ensure timely...read more
Q7. What is the cover we used to take in UPVC water distribution pipe.
The cover used for UPVC water distribution pipes is typically made of a durable and corrosion-resistant material.
The cover is designed to protect the pipe from external elements and prevent any damage or contamination.
It is usually made of UPVC (Unplasticized Polyvinyl Chloride) material, which is known for its strength and longevity.
The cover is securely fitted over the pipe to ensure a tight seal and prevent any leakage.
It may have additional features such as locking mechan...read more