i
Filter interviews by
I applied via campus placement at Lovely Professional University (LPU) and was interviewed in Mar 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
Javascript, python,ML ,nodejs
Merge sort is a divide-and-conquer algorithm that recursively divides an array into two halves, sorts them, and then merges them.
Merge sort has a time complexity of O(n log n).
It works by dividing the array into two halves, sorting each half, and then merging them back together.
The merge step involves comparing elements from both halves and placing them in the correct order.
Merge sort is a stable sorting algorithm, mea...
Cube Highways and Transport Assets Advisors interview questions for popular designations
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
I applied via Job Portal and was interviewed before Jul 2023. There was 1 interview round.
What are steps for procurement of materials?
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
Related Job Profile Timing Something 1 Hours above.
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
CBR test is a laboratory test to determine the strength of subgrade soil for highway construction.
CBR stands for California Bearing Ratio.
It measures the strength of subgrade soil by comparing the pressure required to penetrate the soil with a standard material.
CBR values help in designing the thickness of pavement layers for highways.
Higher CBR values indicate better soil strength and require less pavement thickness.
F...
Embankment is the raised structure built with earth or other materials, while subgrade is the natural ground level beneath the pavement.
Embankment is man-made, built with materials like soil, rock, or concrete to raise the road level above the surrounding terrain.
Subgrade is the natural ground level beneath the pavement, prepared to support the road structure.
Embankment provides stability and support to the road, while...
Misdesign of bituminous mix can lead to premature pavement distress and reduced pavement life.
Improper selection of aggregate gradation
Incorrect binder content
Inadequate compaction during construction
Poor quality control measures
Lack of proper drainage design
Failure to consider traffic volume and loadings
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.
Top trending discussions
Interview experience
based on 58 reviews
Rating in categories
Software Developer
13
salaries
| ₹4.2 L/yr - ₹7.4 L/yr |
Senior Executive
13
salaries
| ₹5.6 L/yr - ₹8 L/yr |
Assistant Manager
12
salaries
| ₹3.7 L/yr - ₹10.9 L/yr |
Manager
7
salaries
| ₹9.4 L/yr - ₹36.6 L/yr |
Highway Engineer
7
salaries
| ₹3.8 L/yr - ₹6 L/yr |
IRB Infrastructure
Roadis Group
Ashoka Buildcon
GMR Group