i
Filter interviews by
Top trending discussions
I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.
CCTV installation involves mounting cameras, running cables, and configuring devices for monitoring and recording.
Mount cameras in strategic locations for optimal coverage
Run cables to connect cameras to recording devices
Configure recording devices for continuous monitoring and storage
Set up remote access for viewing footage from anywhere
Power panels wiring can be done for both 230V below and above requirements.
Power panels can be wired for 230V below by using appropriate gauge wires and ensuring proper connections.
For 230V above requirements, higher gauge wires and suitable circuit breakers should be used to handle the increased voltage.
It is important to follow electrical codes and safety guidelines when wiring power panels for different voltage requ
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I was interviewed in Jan 2025.
I worked at a software development company specializing in cloud solutions.
Developed and maintained cloud-based applications
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
Participated in regular code reviews and testing processes
I have 5 years of experience in IT, specializing in network infrastructure and system administration.
5 years of experience in IT
Specializing in network infrastructure and system administration
Certifications in Cisco CCNA and Microsoft MCSA
I am looking for a job in IRB because of the company's reputation for innovation and growth opportunities.
Interested in working for a company known for innovation
Seeking growth opportunities within the organization
Impressed by IRB's reputation in the industry
I am looking for a competitive salary that reflects my skills and experience in the industry.
Research the average salary range for System Engineers in the industry and location
Consider your level of experience, certifications, and skills when determining your salary expectations
Be prepared to negotiate based on the benefits package offered by the company
Provide a salary range rather than a specific number to allow for
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
I have worked on INDAS 115 and INDAS 116 in my previous role as a financial analyst.
Implemented INDAS 115 to recognize revenue from contracts with customers
Applied INDAS 116 to account for leases in financial statements
Ensured compliance with INDAS standards in financial reporting
Prepared financial statements following the guidelines of INDAS
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Software Developer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
IRB Infrastructure
Roadis Group
Ashoka Buildcon
GMR Group