Q1. What CBR Test and how it is important for Highway Construction.
CBR test is a laboratory test to determine the strength of subgrade soil for highway construction.
CBR stands for California Bearing Ratio.
It measures the strength of subgrade soil by comparing the pressure required to penetrate the soil with a standard material.
CBR values help in designing the thickness of pavement layers for highways.
Higher CBR values indicate better soil strength and require less pavement thickness.
For example, a CBR value of 10 means the soil can support 1...read more
Q2. Difference between Embankment and Subgrade
Embankment is the raised structure built with earth or other materials, while subgrade is the natural ground level beneath the pavement.
Embankment is man-made, built with materials like soil, rock, or concrete to raise the road level above the surrounding terrain.
Subgrade is the natural ground level beneath the pavement, prepared to support the road structure.
Embankment provides stability and support to the road, while subgrade serves as the foundation for the pavement.
Exampl...read more
Q3. Mis Design of Bituminous Mix
Misdesign of bituminous mix can lead to premature pavement distress and reduced pavement life.
Improper selection of aggregate gradation
Incorrect binder content
Inadequate compaction during construction
Poor quality control measures
Lack of proper drainage design
Failure to consider traffic volume and loadings
Q4. Merge sort algorithm
Merge sort is a divide-and-conquer algorithm that recursively divides an array into two halves, sorts them, and then merges them.
Merge sort has a time complexity of O(n log n).
It works by dividing the array into two halves, sorting each half, and then merging them back together.
The merge step involves comparing elements from both halves and placing them in the correct order.
Merge sort is a stable sorting algorithm, meaning that it preserves the relative order of equal element...read more
Q5. planning of man power
Planning of man power involves assessing staffing needs, creating schedules, and ensuring adequate coverage.
Assess staffing needs based on facility size, services offered, and peak hours of operation
Create schedules that balance workload and employee availability
Ensure adequate coverage by cross-training employees and having backup plans in place
Regularly review and adjust staffing plans based on changing needs and budget constraints
Q6. What is colur code of RJ 45
Q7. What is LAN,WAN,MAN, topology