ABIL Group Interview Questions, Process, and Tips

Updated 31 Jul 2024

Top ABIL Group Interview Questions and Answers

View all 7 questions

ABIL Group Interview Experiences

Popular Designations

8 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Current company CTC asked
  • Q2. Don't given more hike
Round 2 - Technical 

(2 Questions)

  • Q1. About previous company activity
  • Q2. Technical questions on site

Interview Preparation Tips

Interview preparation tips for other job seekers - It was nice interview.
Three interview has been taken
Company is best
Try to join Manager level post

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Cost per sqft of all activities of a building.
  • Ans. 

    Cost per sqft of all activities of a building varies based on factors like location, materials used, labor costs, and project scope.

    • Cost per sqft can range from $100 to $500 depending on the complexity of the project.

    • Factors influencing cost include materials, labor, permits, design fees, and overhead.

    • High-end finishes and specialized construction techniques can increase cost per sqft.

    • Geographical location can also imp...

  • Answered by AI
  • Q2. Cost is primary construction materials

Interview Preparation Tips

Topics to prepare for ABIL Group Senior Estimation Engineer interview:
  • Material rates
  • Rate analysis

Senior Estimation Engineer Interview Questions asked at other Companies

Q1. Shear wall crossectional area to built up area ratio and its code
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is average cost per square feet
  • Ans. 

    Average cost per square feet is the total cost of a property divided by the total square footage of the property.

    • Calculate total cost of the property

    • Calculate total square footage of the property

    • Divide total cost by total square footage to get average cost per square feet

  • Answered by AI
  • Q2. What is the Cost for equipments
  • Ans. 

    The cost for equipments can vary depending on the type, brand, and quality of the equipment.

    • Cost of equipments can range from a few hundred dollars to several thousand dollars.

    • Factors influencing cost include brand reputation, features, and technology.

    • For example, a basic laptop may cost around $500, while a high-end gaming laptop can cost over $2000.

  • Answered by AI

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Just asking familly back ground
  • Q2. Asking Why you want to leave current job

Interview Preparation Tips

Topics to prepare for ABIL Group Head Civil Project interview:
  • Don't know
Interview preparation tips for other job seekers - When interviewer asked very simple question without technical please understood no one interested in the new company because of their own reason

Head Civil Project Interview Questions asked at other Companies

Q1. Construction process for huge project
View answer (1)

ABIL Group interview questions for popular designations

 Senior Engineer

 (2)

 Senior Estimation Engineer

 (2)

 Finishing Incharge

 (1)

 Head Civil Project

 (1)

 Junior Engineer Civil

 (1)

 Senior Finishing Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Detailed rate per sqft of all activities in a building.
  • Ans. 

    Detailed rate per sqft of all activities in a building is typically provided in a cost estimation document.

    • Rates can vary based on the type of activity (e.g. flooring, painting, electrical work, plumbing, etc.)

    • Rates may also vary based on the quality of materials and finishes used

    • Labor costs, equipment costs, and overhead costs are typically included in the rate per sqft

    • Rates may be provided by contractors, estimators,

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.

Senior Estimation Engineer Interview Questions asked at other Companies

Q1. Shear wall crossectional area to built up area ratio and its code
View answer (1)
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About your experienced and projects
Round 2 - Technical 

(1 Question)

  • Q1. Related to civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Join on your risk...

Finishing Incharge Interview Questions asked at other Companies

Q1. How to Gypsum apply plaster
View answer (1)

Jobs at ABIL Group

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What should be checked during the finishing of swimming pool ?? Plz explain the both stage, before starting the finishing and initial stage of swimming.
  • Q2. Plz explain the sequence of finishing ???
  • Ans. 

    Finishing sequence involves cleaning, sanding, priming, painting, and polishing.

    • Start by cleaning the surface to remove any dirt or debris.

    • Sand the surface to create a smooth and even texture.

    • Apply a primer to help the paint adhere to the surface.

    • Paint the surface with the desired color and finish.

    • Finish by polishing the surface to create a glossy or matte finish.

    • The sequence may vary depending on the type of material ...

  • Answered by AI
  • Q3. Plz explain the process of PU waterproofing methods???
  • Ans. 

    PU waterproofing involves applying a polyurethane coating to a surface to prevent water penetration.

    • Surface preparation is crucial for proper adhesion of the coating

    • The coating is applied in multiple layers for maximum effectiveness

    • PU waterproofing is commonly used for roofs, balconies, and basements

    • The coating can be tinted to match the color of the surface being treated

  • Answered by AI
  • Q4. What is the first step to start the finishing work of any area ???
  • Ans. 

    The first step to start finishing work of any area is to clean and prepare the surface.

    • Remove any debris or dirt from the area

    • Repair any damages or imperfections on the surface

    • Sand or scrape the surface to create a smooth finish

    • Apply a primer or base coat if necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz don't forget the basic knowledge of construction field...

Senior Finishing Engineer Interview Questions asked at other Companies

Q1. What is the first step to start the finishing work of any area ???
View answer (1)

I applied via Campus Placement and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Site Execution, planning, designing of steel
  • Q2. Only site,planning Execution
  • Q3. Site conditions ,and any other

Interview Preparation Tips

Topics to prepare for ABIL Group Junior Engineer Civil interview:
  • Site Execution
Interview preparation tips for other job seekers - ABIL job is very safe,and Diceplane is very strictly

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Fire protection and fire system week check team training
  • Q2. Monthly and weekly report check
Round 2 - Assignment 

Fire and production department

Round 3 - HR 

(2 Questions)

  • Q1. Company Protection and Company Employee Security
  • Q2. There should be no problem in company benefit and company
Round 4 - HR 

(2 Questions)

  • Q1. CompanWhat can we do for the company and the benefits of the company
  • Q2. Company me kitne Data of how many employees are there in the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Resume discussion, how did you overcome stress etc
  • Q2. Previous work experience
  • Ans. 

    I have 3 years of experience working as a Supply Chain Analyst for a large retail company.

    • Managed inventory levels to ensure optimal stock levels and minimize excess inventory

    • Analyzed supply chain data to identify trends and make recommendations for process improvements

    • Collaborated with vendors to negotiate pricing and terms for supply contracts

  • Answered by AI
Round 2 - Case Study 

2 excel sheets where given, to analyze and interpret the data to give a better solution for the problem given

Round 3 - One-on-one 

(2 Questions)

  • Q1. Aptitude question
  • Q2. Why did you choose this career, why planned to switch
  • Ans. 

    I chose this career because of my interest in data analysis and problem-solving in the supply chain industry.

    • Passion for data analysis and problem-solving

    • Interest in the supply chain industry

    • Opportunity for growth and advancement

    • Desire to make a positive impact on business operations

  • Answered by AI

ABIL Group Interview FAQs

How many rounds are there in ABIL Group interview?
ABIL Group interview process usually has 1-2 rounds. The most common rounds in the ABIL Group interview process are Technical, HR and Resume Shortlist.
How to prepare for ABIL Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ABIL Group. The most common topics and skills that interviewers at ABIL Group expect are Execution, Real Estate, Residential, Budgeting and Electricals.
What are the top questions asked in ABIL Group interview?

Some of the top questions asked at the ABIL Group interview -

  1. What is the first step to start the finishing work of any area ...read more
  2. Plz explain the process of PU waterproofing methods...read more
  3. Plz explain the sequence of finishing ...read more

Tell us how to improve this page.

ABIL Group Interview Process

based on 5 interviews in last 1 year

Interview experience

4.4
  
Good

People are getting interviews through

based on 6 ABIL Group interviews
Job Portal
Campus Placement
83%
17%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
K Raheja Corp Interview Questions
4.3
 • 40 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
Piramal Realty Interview Questions
3.8
 • 8 Interviews
View all

ABIL Group Reviews and Ratings

based on 94 reviews

4.1/5

Rating in categories

3.6

Skill development

4.1

Work-Life balance

3.9

Salary & Benefits

4.1

Job Security

4.0

Company culture

3.4

Promotions/Appraisal

3.8

Work Satisfaction

Explore 94 Reviews and Ratings
Assistant Manager
14 salaries
unlock blur

₹5.4 L/yr - ₹10.2 L/yr

Senior Engineer
11 salaries
unlock blur

₹5.8 L/yr - ₹10 L/yr

Manager
10 salaries
unlock blur

₹7.9 L/yr - ₹16 L/yr

Assistant Sales Manager
7 salaries
unlock blur

₹5.4 L/yr - ₹7.3 L/yr

Assistant Manager - MEP
6 salaries
unlock blur

₹7.5 L/yr - ₹9.6 L/yr

Explore more salaries
Compare ABIL Group with

Panchshil Realty

4.4
Compare

K Raheja Corp

4.3
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview