I was interviewed in Dec 2024.
The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.
The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.
The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.
For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...
The unit used for estimating painting work is square feet.
Square feet is commonly used to estimate the amount of paint needed for a project.
Other units like square meters can also be used depending on the region.
Calculations are based on the surface area to be painted.
RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.
RL is used in surveying to determine the elevation of a point relative to a known reference point.
It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.
RL can be calculated using leveling instruments such as a dumpy level or a theodolite.
For example, if a benchmark ha...
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.
Portland cement is the most common type and is used in general construction.
Rapid-hardening cement sets quickly and is often used in repair work.
Sulfate-resistant cement is used in areas where soil or water has high sulfate content.
The size of columns in civil engineering is determined based on the load they will support and the height of the structure.
Columns are sized based on the load they will support, with larger loads requiring larger columns.
The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.
Factors such as material strength, column spacing, and building c...
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
posted on 9 Nov 2024
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete harden...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring the structural integrity and strength of the building.
Components of BBS include bending shapes, cutting length,
posted on 26 Jan 2025
I have over 10 years of experience in civil engineering, managing various construction projects.
Managed construction projects from start to finish
Coordinated with architects, engineers, and contractors
Ensured projects were completed on time and within budget
Handled permits, inspections, and regulatory compliance
Implemented safety protocols and quality control measures
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
posted on 24 Aug 2024
Interview experience
Assistant Manager
14
salaries
| ₹5.4 L/yr - ₹10.2 L/yr |
Senior Engineer
11
salaries
| ₹5.8 L/yr - ₹10 L/yr |
Manager
10
salaries
| ₹7.9 L/yr - ₹16 L/yr |
Assistant Sales Manager
7
salaries
| ₹5.4 L/yr - ₹7.3 L/yr |
Project Manager
7
salaries
| ₹7.5 L/yr - ₹14 L/yr |
Panchshil Realty
K Raheja Corp
Godrej Properties
Sobha