Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ABIL Group Team. If you also belong to the team, you can get access from here

ABIL Group Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 94 Reviews

Filter interviews by

ABIL Group Head Civil Project Interview Questions and Answers

Updated 1 Jan 2024

ABIL Group Head Civil Project Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Just asking familly back ground
  • Q2. Asking Why you want to leave current job

Interview Preparation Tips

Topics to prepare for ABIL Group Head Civil Project interview:
  • Don't know
Interview preparation tips for other job seekers - When interviewer asked very simple question without technical please understood no one interested in the new company because of their own reason

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the grade of concrete
  • Ans. 

    The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.

    • The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.

    • The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.

    • For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...

  • Answered by AI
  • Q2. What is the unit used for estimating painting work?
  • Ans. 

    The unit used for estimating painting work is square feet.

    • Square feet is commonly used to estimate the amount of paint needed for a project.

    • Other units like square meters can also be used depending on the region.

    • Calculations are based on the surface area to be painted.

  • Answered by AI
  • Q3. What you mean by RL in survey
  • Ans. 

    RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.

    • RL is used in surveying to determine the elevation of a point relative to a known reference point.

    • It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.

    • RL can be calculated using leveling instruments such as a dumpy level or a theodolite.

    • For example, if a benchmark ha...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Types of cement
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.

    • Portland cement is the most common type and is used in general construction.

    • Rapid-hardening cement sets quickly and is often used in repair work.

    • Sulfate-resistant cement is used in areas where soil or water has high sulfate content.

  • Answered by AI
  • Q2. Size of columns
  • Ans. 

    The size of columns in civil engineering is determined based on the load they will support and the height of the structure.

    • Columns are sized based on the load they will support, with larger loads requiring larger columns.

    • The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.

    • Factors such as material strength, column spacing, and building c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the basic civil engineering concept and knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Civil engineer 

(2 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.

    • Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more

    • It is made by mixing cement, water, and aggregates like sand and gravel

    • Additives can be included to enhance specific properties of the concrete, such as strength or workability

    • Once mixed, concrete harden...

  • Answered by AI
  • Q2. What is BBS & Components
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.

    • BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.

    • It helps in estimating the quantity of steel required for the project.

    • BBS is essential for ensuring the structural integrity and strength of the building.

    • Components of BBS include bending shapes, cutting length,

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. My experience & my qualification &my knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is your work experience
  • Ans. 

    I have over 10 years of experience in civil engineering, managing various construction projects.

    • Managed construction projects from start to finish

    • Coordinated with architects, engineers, and contractors

    • Ensured projects were completed on time and within budget

    • Handled permits, inspections, and regulatory compliance

    • Implemented safety protocols and quality control measures

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question acording construction line
  • Q2. No of brick in 1 cubic meter
  • Ans. 

    The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

    • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

    • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

    • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Site engineer discussions 

(2 Questions)

  • Q1. What is your job description
  • Q2. What is your job roles

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedication in working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self

ABIL Group Interview FAQs

How many rounds are there in ABIL Group Head Civil Project interview?
ABIL Group interview process usually has 1 rounds. The most common rounds in the ABIL Group interview process are One-on-one Round.

Tell us how to improve this page.

ABIL Group Head Civil Project Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Kalpataru Group Interview Questions
4.0
 • 66 Interviews
Colliers India Interview Questions
4.0
 • 60 Interviews
Casagrand Interview Questions
3.9
 • 53 Interviews
View all
Assistant Manager
14 salaries
unlock blur

₹5.4 L/yr - ₹10.2 L/yr

Senior Engineer
11 salaries
unlock blur

₹5.8 L/yr - ₹10 L/yr

Manager
10 salaries
unlock blur

₹7.9 L/yr - ₹16 L/yr

Assistant Sales Manager
7 salaries
unlock blur

₹5.4 L/yr - ₹7.3 L/yr

Project Manager
7 salaries
unlock blur

₹7.5 L/yr - ₹14 L/yr

Explore more salaries
Compare ABIL Group with

Panchshil Realty

4.4
Compare

K Raheja Corp

4.3
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview