i
ABIL Group
Filter interviews by
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
Finishing sequence involves cleaning, sanding, priming, painting, and polishing.
Start by cleaning the surface to remove any dirt or debris.
Sand the surface to create a smooth and even texture.
Apply a primer to help the paint adhere to the surface.
Paint the surface with the desired color and finish.
Finish by polishing the surface to create a glossy or matte finish.
The sequence may vary depending on the type of material ...
PU waterproofing involves applying a polyurethane coating to a surface to prevent water penetration.
Surface preparation is crucial for proper adhesion of the coating
The coating is applied in multiple layers for maximum effectiveness
PU waterproofing is commonly used for roofs, balconies, and basements
The coating can be tinted to match the color of the surface being treated
The first step to start finishing work of any area is to clean and prepare the surface.
Remove any debris or dirt from the area
Repair any damages or imperfections on the surface
Sand or scrape the surface to create a smooth finish
Apply a primer or base coat if necessary
Top trending discussions
posted on 18 May 2024
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Assistant Manager
14
salaries
| ₹5.4 L/yr - ₹10.2 L/yr |
Senior Engineer
11
salaries
| ₹5.8 L/yr - ₹10 L/yr |
Manager
10
salaries
| ₹7.9 L/yr - ₹16 L/yr |
Assistant Sales Manager
7
salaries
| ₹5.4 L/yr - ₹7.3 L/yr |
Project Manager
7
salaries
| ₹7.5 L/yr - ₹14 L/yr |
Panchshil Realty
K Raheja Corp
Godrej Properties
Sobha