A step-wise approach to finishing work ensures quality and efficiency in production processes.
1. Planning: Define the finishing requirements and timelines. Example: Create a schedule for surface treatment.
2. Preparation: Gather necessary materials and tools. Example: Ensure all sanding equipment is ready before starting.
3. Execution: Carry out the finishing processes systematically. Example: Apply paint in even coats t...
Flat customer handover can lead to issues like incomplete work, quality concerns, and miscommunication.
Incomplete Work: If finishing touches are not completed, customers may find defects or unfinished areas.
Quality Concerns: Poor quality control can result in dissatisfaction; for example, paint not drying properly.
Miscommunication: Lack of clear communication about customer expectations can lead to misunderstandings.
Do...
Waterproofing involves techniques to prevent water ingress, ensuring structural integrity and longevity of buildings.
Identify areas prone to water exposure, such as basements and roofs.
Use appropriate waterproofing materials like membranes, coatings, or sealants.
Conduct thorough surface preparation to ensure adhesion and effectiveness.
Implement drainage systems to redirect water away from structures.
Regularly inspect a...
Italian marble fixing involves precise techniques for installation, ensuring durability and aesthetic appeal.
Surface Preparation: Ensure the substrate is clean, dry, and level before installation.
Adhesive Selection: Use a high-quality adhesive suitable for marble to prevent slippage.
Layout Planning: Plan the layout to minimize cuts and ensure a balanced appearance.
Joint Spacing: Maintain consistent joint spacing for ae...
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
Top trending discussions
OPC stands for Ordinary Portland Cement, which is a widely used type of cement in construction work.
OPC is a type of cement that is commonly used in the construction industry.
It is known for its high strength and durability.
OPC is made by grinding clinker, gypsum, and other materials.
It is used in various applications such as concrete, mortar, and plaster.
OPC is available in different grades, such as OPC 33, OPC 43, an
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
One meter is equal to 39.37 inches.
One meter is equivalent to 100 centimeters.
One inch is equal to 2.54 centimeters.
To convert meters to inches, multiply by 39.37 (100 * 2.54).
Steel density is typically around 7.85 g/cm^3.
Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary depending on the specific alloy composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.
I applied via Referral
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 2 Dec 2024
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
based on 4 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Manager
230
salaries
| ₹5.4 L/yr - ₹16 L/yr |
Senior Engineer
172
salaries
| ₹3.8 L/yr - ₹12.5 L/yr |
Assistant Engineer
105
salaries
| ₹2.6 L/yr - ₹8 L/yr |
Senior Executive
99
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Assistant General Manager
89
salaries
| ₹17 L/yr - ₹35 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties