Filter interviews by
Be the first one to contribute and help others!
posted on 3 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
I have over 10 years of experience in sales management, leading teams to exceed targets and drive revenue growth.
Managed a team of 15 sales representatives, consistently exceeding monthly sales targets by 20%
Implemented new sales strategies that resulted in a 30% increase in revenue within the first year
Developed strong relationships with key clients, leading to repeat business and referrals
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Company restructuring or downsizing
Relocation to a different area
I am currently drawing a salary of $70,000 per year.
My current salary is $70,000 per year
I am satisfied with my current salary
I am open to discussing salary expectations for this position
I expect to lead a high-performing sales team, drive revenue growth, and exceed targets.
Lead and motivate sales team to achieve targets
Develop and implement sales strategies to drive revenue growth
Monitor and analyze sales performance to make data-driven decisions
Build strong relationships with clients and partners
Stay updated on industry trends and competitor activities
posted on 21 Aug 2024
I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.
Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.
SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works
CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works
NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered Survey...
Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.
Bluebeam
Planswift
CostX
NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.
NRM1 is used for the preparation of bills of quantities in construction projects.
NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying construc...
Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.
Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.
It focuses on improving the value of a project by optimizing its functions, quality, and cost.
Value Engineering often involves brainstorming sessions with a team of experts to...
Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.
Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.
Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.
Quantity Surveyors also provide advice on contractual m...
Salary expectation is based on qualifications, experience, industry standards, and location.
Consider industry standards for Civil Quantity Surveyors and Site Engineers
Take into account your level of experience and qualifications
Factor in the location of the job as cost of living varies
Research average salaries for similar positions in your area
Be prepared to negotiate based on benefits and perks offered
posted on 4 Jan 2025
Algorithm to create a Linked List.
posted on 13 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
posted on 15 Oct 2024
I applied via Campus Placement
General aptitude followed by technical questions.
Basic GD topics to test your communication skills.
I want to join this company because of its reputation for innovation, strong company culture, and opportunities for growth.
Reputation for innovation in the industry
Strong company culture that values employee development
Opportunities for growth and advancement within the company
posted on 20 Dec 2024
posted on 10 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.
Plaster deductions as per IS code include deductions for openings, thickness variations, etc.
Plaster deductions are specified in IS 1200-Part 8: 1974 (Reaffirmed 2003)
Deductions are made for openings such as doors, windows, etc.
Thickness variations in plaster are also considered for deductions
The deductions are calculated based on the area of the openings and the thickness variations
I was responsible for preparing and analyzing project billing documents in my previous company.
Prepared detailed billing reports for various projects
Analyzed project costs and expenses to ensure accuracy in billing
Collaborated with project managers and clients to resolve any billing discrepancies
posted on 4 Aug 2024
Structure complete at the time taken as built coordinate
Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.
Start by reviewing property deeds and legal documents to understand boundaries
Use surveying equipment like total stations or GPS to measure and mark boundaries accurately
Consider any existing structures or obstacles on the site that may affect the survey layout
Setting out coordinate involves establishing points on the ground based on a specific coordinate system.
Use surveying equipment like total stations or GPS to accurately measure and mark points
Ensure the coordinate system used is consistent and accurate
Verify the points set out match the design or plan specifications
posted on 12 Nov 2024
I applied via Recruitment Consulltant
based on 3 reviews
Rating in categories
Executive Assistant
3
salaries
| ₹5 L/yr - ₹5 L/yr |
Indian Institute of Technology BHU
TCS
Infosys
Wipro