EPIC is a large body of work that can be broken down into smaller, more manageable pieces called stories.
EPIC is a high-level requirement that is too large to be completed in a single iteration.
Stories are smaller, more detailed requirements that can be completed within a single iteration.
EPICs are typically broken down into stories during the backlog grooming process.
Stories are usually written from the perspective of...
Story points are arrived at through collaborative effort of the team based on complexity, effort, and risk involved in a user story.
Discuss the user story with the team to understand the requirements and potential challenges
Break down the user story into tasks and estimate the effort required for each task
Consider factors like complexity, uncertainty, dependencies, and risks involved in completing the user story
Use a s...
Team velocity is a measure of the amount of work a team can complete in a sprint.
Team velocity is calculated by summing up the story points completed in a sprint.
It helps the team understand how much work they can realistically accomplish in future sprints.
Velocity is used for sprint planning and forecasting project timelines.
It is not a measure of individual productivity but rather the team's overall capacity.
For exam...
Major challenges faced include communication issues, changing requirements, team dynamics, and stakeholder management.
Communication issues between team members and stakeholders can lead to misunderstandings and delays.
Changing requirements can disrupt project timelines and require frequent adjustments.
Team dynamics such as conflicts or lack of collaboration can impact productivity and morale.
Stakeholder management invo...
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
posted on 26 Mar 2024
Artifacts of Scrum process include product backlog, sprint backlog, and increment.
Product backlog: List of all desired work on the project
Sprint backlog: List of tasks to be completed during the sprint
Increment: The sum of all the product backlog items completed during a sprint
posted on 23 Jun 2022
I applied via Recruitment Consulltant
Scrum rituals are regular meetings held during a sprint to facilitate communication and collaboration within the team.
Sprint Planning
Daily Scrum
Sprint Review
Sprint Retrospective
Risk mitigation is the process of identifying, assessing, and reducing risks to an acceptable level.
Identify potential risks
Assess the likelihood and impact of each risk
Develop a plan to reduce or eliminate the risk
Implement the plan
Monitor and review the effectiveness of the plan
Scrum rituals are regular meetings held during a sprint to facilitate communication and collaboration within the team.
Sprint Planning
Daily Scrum
Sprint Review
Sprint Retrospective
posted on 29 Apr 2023
I applied via Referral and was interviewed before Apr 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 18 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
based on 7 reviews
Rating in categories
Project Engineer
32.6k
salaries
| ₹1.8 L/yr - ₹8.3 L/yr |
Senior Software Engineer
22.9k
salaries
| ₹5.8 L/yr - ₹22.4 L/yr |
Senior Associate
21.1k
salaries
| ₹0.8 L/yr - ₹5.5 L/yr |
Senior Project Engineer
20.6k
salaries
| ₹5 L/yr - ₹19.3 L/yr |
Technical Lead
18.6k
salaries
| ₹8.2 L/yr - ₹36.5 L/yr |
TCS
Infosys
Tesla
Amazon