i
Welspun Living Limited
Filter interviews by
I am familiar with various planning systems used in project management, such as Gantt charts, critical path method, and resource allocation tools.
Knowledge of Gantt charts for visualizing project timelines
Understanding of critical path method for identifying project dependencies
Experience with resource allocation tools for optimizing project resources
Top trending discussions
I applied via Referral and was interviewed in Aug 2022. There were 2 interview rounds.
Yarn planning for towel/sheeting involves determining the required yarn count, twist, and ply based on the desired fabric weight, texture, and strength.
Determine the desired fabric weight and texture
Calculate the required yarn count based on the fabric weight and texture
Determine the required twist and ply based on the desired fabric strength
Consider the availability and cost of the yarn
Ensure consistency in yarn quali...
based on 1 interview
Interview experience
Assistant Manager
362
salaries
| ₹3.2 L/yr - ₹12.7 L/yr |
Manager
151
salaries
| ₹6.5 L/yr - ₹21.5 L/yr |
Officer
139
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Engineer
104
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Assistant General Manager
99
salaries
| ₹10.8 L/yr - ₹36.5 L/yr |
Tata Steel
JSW Steel
Reliance Industries
Aditya Birla Group