To remove bumping in sg at hard rock areas, proper rock excavation techniques and road design considerations are necessary.
Perform thorough rock excavation to remove any irregularities or protrusions in the hard rock areas.
Ensure proper compaction of the subgrade and base layers to minimize settlement and unevenness.
Design the road profile with appropriate cross slopes and superelevation to facilitate smooth vehicle mo...
The grade of GSB used in previous projects varies depending on the specific project requirements.
The grade of GSB (Granular Sub-Base) used in previous projects is determined based on factors such as traffic load, soil conditions, and project specifications.
Different grades of GSB, such as GSB-20, GSB-25, GSB-30, etc., may be used in different projects.
For example, in a high-traffic highway project, a higher grade of GS...
I have completed 10 projects in BHAI.
Completed 10 projects in BHAI
Projects include highway construction, bridge design, and road maintenance
Implemented innovative solutions for traffic management and safety
Collaborated with stakeholders to ensure project success
The cost of projects in the present work varies depending on the scope and scale of the project.
Project costs can range from a few thousand dollars to millions of dollars.
Factors influencing project costs include materials, labor, equipment, permits, and unforeseen expenses.
Examples of project costs include road construction, bridge repairs, and traffic signal installations.
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
GRI standards applicable for WEL include GRI 403: Occupational Health and Safety and GRI 416: Customer Health and Safety
GRI 403: Occupational Health and Safety focuses on the organization's efforts to assess and manage occupational health and safety risks
GRI 416: Customer Health and Safety addresses the organization's efforts to provide safe products and services to customers
Both standards are relevant for assessing an...
Welspun Enterprises interview questions for popular designations
Get interview-ready with Top Welspun Enterprises Interview Questions
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.
IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies
IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines
Aerators are devices used to add air into water or other liquids to increase oxygen levels.
Surface aerators
Submersible aerators
Diffused aerators
Mechanical aerators
Aspirating aerators
Relevant questions and prior experiences.
Water treatment process involves several steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove particles
Sedimentation to settle out solids
Filtration to remove remaining particles
Disinfection to kill bacteria and viruses
pH adjustment to control acidity or alkalinity
I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2023. There were 3 interview rounds.
Top trending discussions
The duration of Welspun Enterprises interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interviews
Interview experience
based on 378 reviews
Rating in categories
Assistant Manager
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
70
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Enterprises
Larsen & Toubro Limited
Tata Projects
GMR Group