i
VTP Realty
Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
Answering questions related to construction projects and past experience.
Cost per square foot is dependent on various factors such as location, materials used, and labor costs.
Steel consumption per square foot varies depending on the type of structure and design.
Concrete consumption per square foot also varies depending on the type of structure and design.
All activities required to complete a building per square foot i...
The interviewee was asked about method of statement, SOP followed in past, and quality process followed.
For each activity, a detailed method of statement is prepared to ensure proper execution.
Standard Operating Procedures (SOPs) are followed to maintain consistency and efficiency.
A quality process is followed to ensure that the work meets the required standards and specifications.
Examples of quality processes include ...
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I appeared for an interview in Jan 2025.
VTP Realty interview questions for popular designations
Get interview-ready with Top VTP Realty Interview Questions
I appeared for an interview in Dec 2024.
Top trending discussions
Some of the top questions asked at the VTP Realty interview -
The duration of VTP Realty interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 41 interviews
Interview experience
based on 270 reviews
Rating in categories
Senior Engineer
63
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Manager
49
salaries
| ₹0 L/yr - ₹0 L/yr |
CRM Executive
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales Executive
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Godrej Properties
Prestige Group
Sobha
DLF