VTP Realty Project Cost Control Engineer Interview Questions and Answers

Updated 10 May 2022

VTP Realty Project Cost Control Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Rate analysis for Civil Items
  • Ans. 

    Rate analysis for Civil Items involves calculating the cost of materials, labor, and equipment needed for a construction project.

    • Identify the materials required for the project

    • Determine the cost of each material

    • Calculate the labor cost based on the number of workers and hours required

    • Factor in the cost of equipment needed for the project

    • Consider any additional costs such as transportation and overhead

    • Example: Rate anal...

  • Answered by AI
  • Q2. Constants for various Civil Activities on Builtup Area
  • Ans. 

    Constants for civil activities on builtup area are determined by factors such as soil type, foundation type, and building height.

    • Constants for civil activities on builtup area vary depending on soil type

    • Foundation type also plays a role in determining constants for civil activities

    • Building height is another factor that affects constants for civil activities

    • Examples of civil activities include excavation, foundation con

  • Answered by AI
  • Q3. Types Of Painting & Plaster work
  • Ans. 

    Painting and plaster work are important aspects of construction projects.

    • Types of painting include interior, exterior, decorative, and protective.

    • Plaster work involves applying a mixture of cement, sand, and water to walls and ceilings.

    • Different types of plaster include gypsum plaster, lime plaster, and cement plaster.

    • Plaster work can also involve creating decorative finishes such as stucco or Venetian plaster.

    • Proper p...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for VTP Realty Project Cost Control Engineer interview:
  • Bar Bending Schedule
  • Rate Analysis
  • Quantity Estimation
Interview preparation tips for other job seekers - Go through all the constants for all activities.
Learn Density and specific gravity.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - Technical 

(3 Questions)

  • Q1. Basic fundamentals of plumbing and fire fighting system.
  • Q2. Fire pump room single line diagram and working.
  • Ans. 

    A fire pump room single line diagram illustrates the components and flow of water in fire protection systems.

    • Includes main components: fire pump, controller, water supply, and discharge piping.

    • Fire pump types: centrifugal, positive displacement, each suited for different applications.

    • Controller manages pump operation, ensuring automatic activation during fire alarms.

    • Water supply sources: municipal water, tanks, or rese...

  • Answered by AI
  • Q3. Fire pump technical data sheet detail.
Round 2 - Group Discussion 

Plumbing and fire fighting NBC code Standard etc.

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion.
  • Q2. Why to join our organisation.
  • Ans. 

    I am excited to join your organization for its innovative projects, collaborative culture, and commitment to professional growth.

    • Innovative Projects: Your organization is known for cutting-edge technology, such as the recent AI-driven solutions that enhance user experience.

    • Collaborative Culture: I appreciate the emphasis on teamwork, as seen in your recent cross-departmental project that improved product delivery times...

  • Answered by AI

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
No response

I applied via Campus Placement and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Self intro , sales and marketing,situation baes ed question
Round 3 - One-on-one 

(1 Question)

  • Q1. Internship, marketing questions
Round 4 - Case Study 

Excel sheet filling round

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Job experience and hobbies
  • Q2. Salary expectations and location

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for beginners who want to work in real estate
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Job description
  • Q2. Qualification working experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell about yourself
  • Q2. Tell your past experience
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell about yourself
  • Q2. Tell about your past experiences

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work

VTP Realty Interview FAQs

How many rounds are there in VTP Realty Project Cost Control Engineer interview?
VTP Realty interview process usually has 2 rounds. The most common rounds in the VTP Realty interview process are Resume Shortlist and Technical.
What are the top questions asked in VTP Realty Project Cost Control Engineer interview?

Some of the top questions asked at the VTP Realty Project Cost Control Engineer interview -

  1. Constants for various Civil Activities on Builtup A...read more
  2. Types Of Painting & Plaster w...read more
  3. Rate analysis for Civil It...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.2
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Knight Frank Interview Questions
4.0
 • 44 Interviews
360 Realtors Interview Questions
3.8
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 33 Interviews
Smartworks Interview Questions
3.6
 • 32 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
View all
Assistant Manager
74 salaries
unlock blur

₹4.6 L/yr - ₹12 L/yr

Senior Engineer
63 salaries
unlock blur

₹4.6 L/yr - ₹9 L/yr

Sales Manager
49 salaries
unlock blur

₹4.8 L/yr - ₹12.2 L/yr

CRM Executive
39 salaries
unlock blur

₹2.1 L/yr - ₹5.5 L/yr

Senior Sales Executive
36 salaries
unlock blur

₹3.7 L/yr - ₹6 L/yr

Explore more salaries
Compare VTP Realty with

Knight Frank

4.0
Compare

M3M India

4.1
Compare

R.S. Infraprojects

3.9
Compare

Emaar India Limited

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview