Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by VTP GROUP Team. If you also belong to the team, you can get access from here

VTP GROUP Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 93 Reviews

Filter interviews by

VTP GROUP Senior Engineer Interview Questions and Answers

Updated 3 Feb 2022

VTP GROUP Senior Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Building activity process
  • Q2. Waterproofing process

Interview Preparation Tips

Interview preparation tips for other job seekers - Hr interview is very important in this company

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced Senior Engineer with a strong background in software development and project management.

    • Over 10 years of experience in software development

    • Expertise in project management and leading cross-functional teams

    • Proficient in multiple programming languages such as Java, Python, and C++

    • Strong problem-solving skills and ability to deliver high-quality solutions

    • Previous experience working on large-scale projects for

  • Answered by AI
  • Q2. Tell me about block works
  • Ans. 

    Block works refer to the construction of walls using blocks made of materials like concrete, clay, or stone.

    • Blocks are typically made of materials like concrete, clay, or stone

    • Blocks are stacked and bonded together using mortar to create walls

    • Block works are commonly used in construction for both interior and exterior walls

    • Different types of blocks, such as concrete blocks or clay bricks, can be used for block works

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Company policy and culture is very nice and has good name in the market. From outside it's nice.But there is no use for individual performance. Very less salary and very less increment. Lot of politics in the increments. People who are close to VP will get good increments , if they didn't worked also. But people who are not close to VP after good performance also they didn't get good increments.

Here you must maintain good relationship with PM. Or else they will give complaint to VP and VP will transfer to far location by blindly believing PMs.

Here some PMs are there, they didn't even know how to write a mail and how to hold a drawing. He is working here from past 13 years.. Because of him many works are doubled.

Whether you work or not that's not come to consideration. Whether you are washing their back or not that's only thing will be considered here.

If you are coming for good salary than no problem. But it's less means than its loss. No salary and no career growth.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. One meter how much inch
  • Ans. 

    One meter is equal to 39.37 inches.

    • One meter is equivalent to 100 centimeters.

    • One inch is equal to 2.54 centimeters.

    • To convert meters to inches, multiply by 39.37 (100 * 2.54).

  • Answered by AI
  • Q2. Steel density value and units
  • Ans. 

    Steel density is typically around 7.85 g/cm^3.

    • Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel can vary depending on the specific alloy composition.

    • For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Explain your privious jobs about your response
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

VTP GROUP Interview FAQs

How many rounds are there in VTP GROUP Senior Engineer interview?
VTP GROUP interview process usually has 2 rounds. The most common rounds in the VTP GROUP interview process are Resume Shortlist and Technical.
How to prepare for VTP GROUP Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at VTP GROUP. The most common topics and skills that interviewers at VTP GROUP expect are Quantity Surveying, Bar Bending Schedule, Billing, Civil Engineering and Contracts.
What are the top questions asked in VTP GROUP Senior Engineer interview?

Some of the top questions asked at the VTP GROUP Senior Engineer interview -

  1. Building activity proc...read more
  2. Waterproofing proc...read more

Tell us how to improve this page.

VTP GROUP Senior Engineer Salary
based on 14 salaries
₹4 L/yr - ₹9 L/yr
30% less than the average Senior Engineer Salary in India
View more details

VTP GROUP Senior Engineer Reviews and Ratings

based on 2 reviews

1.5/5

Rating in categories

1.2

Skill development

1.0

Work-life balance

2.0

Salary

1.7

Job security

1.0

Company culture

1.0

Promotions

1.2

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
14 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Senior Accounts Executive
12 salaries
unlock blur

₹3.8 L/yr - ₹6.2 L/yr

Sales Manager
12 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Assistant Manager
11 salaries
unlock blur

₹4.6 L/yr - ₹6.3 L/yr

Executive Accountant
10 salaries
unlock blur

₹2.5 L/yr - ₹3.2 L/yr

Explore more salaries
Compare VTP GROUP with

Godrej Industries Group

4.0
Compare

Tata Group

4.2
Compare

Adani Group

3.9
Compare

Reliance Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview