Questions related to construction project details.
Steel consumption per square foot depends on the type of structure and design.
Concrete consumption varies based on the mix design and structural requirements.
Construction cost per square foot depends on the location, materials used, and labor costs.
Activity wise construction cost includes costs for excavation, foundation, superstructure, finishes, etc.
Slab cycle in cons...
Top trending discussions
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
posted on 9 Nov 2024
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete harden...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring the structural integrity and strength of the building.
Components of BBS include bending shapes, cutting length,
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
posted on 27 Nov 2023
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 24 Aug 2024
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
The sequence of activities for aluminium (mivan) structure construction involves several steps.
Preparing the site and marking the layout
Constructing the foundation and footings
Erecting the aluminium formwork panels
Fixing reinforcement bars and embedment items
Pouring concrete into the formwork
Curing the concrete
Stripping the formwork
Finishing and cleaning the structure
The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.
Inspecting and correcting any defects or deficiencies
Installing finishes such as flooring, paint, and fixtures
Completing final electrical and plumbing work
Cleaning and tidying up the site
Obtaining necessary permits and certifications
Conducting final inspections
Handing over the comp
Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.
Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.
The test involves subjecting the waterproofing system to a specified water depth for a certain duration.
The duration of the test can vary depending on the project ...
The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.
The accepted rolling margin value can range from 2% to 5%.
It is important to consult project specifications and industry guidelines for the specific rolling margin value.
For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...
The unit weight of steel refers to the weight of a given volume of steel material.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel being used.
For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.
The unit weight of reinfo...
based on 1 review
Rating in categories
Senior Engineer
14
salaries
| ₹4 L/yr - ₹9 L/yr |
Senior Accounts Executive
13
salaries
| ₹3.8 L/yr - ₹6.2 L/yr |
Sales Manager
12
salaries
| ₹3.6 L/yr - ₹8.5 L/yr |
Assistant Manager
11
salaries
| ₹4.6 L/yr - ₹6.3 L/yr |
Executive Accountant
10
salaries
| ₹2.5 L/yr - ₹3.2 L/yr |
Godrej Industries Group
Tata Group
Adani Group
Reliance Industries