Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by VTP GROUP Team. If you also belong to the team, you can get access from here

VTP GROUP Verified Tick

Compare button icon Compare button icon Compare
3.7

based on 92 Reviews

Filter interviews by

VTP GROUP Deputy General Manager Civil Interview Questions and Answers

Updated 3 Apr 2022

VTP GROUP Deputy General Manager Civil Interview Experiences

1 interview found

Deputy General Manager Civil Interview Questions & Answers

user image Mukesh Bhagvan Jadhav

posted on 1 Apr 2022

I applied via Naukri.com

Round 1 - Technical 

(1 Question)

  • Q1. 1. Steel consumption per sft. 2. Concrete consumption. 3. Construction cost per sft 4. Activity wise construction cost . 5. Slab cycle in construction. 6. Duration of project. 7. Types of project complete...
  • Ans. 

    Questions related to construction project details.

    • Steel consumption per square foot depends on the type of structure and design.

    • Concrete consumption varies based on the mix design and structural requirements.

    • Construction cost per square foot depends on the location, materials used, and labor costs.

    • Activity wise construction cost includes costs for excavation, foundation, superstructure, finishes, etc.

    • Slab cycle in cons...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Technical knowledge is must.
2. Large scale residential project experience is required.
3. Also end to end project completion experience required, including initiation, costing, execution, monitoring, quality control and handling over of project.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Civil engineer 

(2 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.

    • Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more

    • It is made by mixing cement, water, and aggregates like sand and gravel

    • Additives can be included to enhance specific properties of the concrete, such as strength or workability

    • Once mixed, concrete harden...

  • Answered by AI
  • Q2. What is BBS & Components
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.

    • BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.

    • It helps in estimating the quantity of steel required for the project.

    • BBS is essential for ensuring the structural integrity and strength of the building.

    • Components of BBS include bending shapes, cutting length,

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question acording construction line
  • Q2. No of brick in 1 cubic meter
  • Ans. 

    The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

    • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

    • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

    • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Selection process and location civil engineering jobs ke liye please fresher condidate.
Round 3 - Technical 

(1 Question)

  • Q1. Selection process and location

Interview Preparation Tips

Interview preparation tips for other job seekers - Please reply sir
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pressure in fire hydrant pipe
  • Ans. 

    Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.

    • Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.

    • The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.

    • Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...

  • Answered by AI
  • Q2. What is NRC full form
  • Ans. 

    NRC stands for National Register of Citizens.

    • NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.

    • It was first prepared in 1951 and is now being updated to identify illegal immigrants.

    • The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Aluminium (mivan) structure sequence of activities?
  • Ans. 

    The sequence of activities for aluminium (mivan) structure construction involves several steps.

    • Preparing the site and marking the layout

    • Constructing the foundation and footings

    • Erecting the aluminium formwork panels

    • Fixing reinforcement bars and embedment items

    • Pouring concrete into the formwork

    • Curing the concrete

    • Stripping the formwork

    • Finishing and cleaning the structure

  • Answered by AI
  • Q2. Finishing worksequence of activities?
  • Ans. 

    The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.

    • Inspecting and correcting any defects or deficiencies

    • Installing finishes such as flooring, paint, and fixtures

    • Completing final electrical and plumbing work

    • Cleaning and tidying up the site

    • Obtaining necessary permits and certifications

    • Conducting final inspections

    • Handing over the comp

  • Answered by AI
  • Q3. Water proofing ponding test hours?
  • Ans. 

    Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.

    • Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.

    • The test involves subjecting the waterproofing system to a specified water depth for a certain duration.

    • The duration of the test can vary depending on the project ...

  • Answered by AI
  • Q4. How much accepted 8mm to 10mm steel rod rolling margine value ?
  • Ans. 

    The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.

    • The accepted rolling margin value can range from 2% to 5%.

    • It is important to consult project specifications and industry guidelines for the specific rolling margin value.

    • For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...

  • Answered by AI
  • Q5. Unit Weight of Steel?
  • Ans. 

    The unit weight of steel refers to the weight of a given volume of steel material.

    • The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • The specific unit weight of steel can vary depending on the type and grade of steel being used.

    • For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.

    • The unit weight of reinfo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1) Achieve your goals, give your best.
2) Don't do over thinking.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Civil engineering my skills
  • Q2. Site engineering skills

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good
1. Project planning
2. AutoCAD
3. Design thinking
4. Relationship Building
5. Revit
6. Staad pro
7. Surveying planning
8. Computer Skill
9. Excellent communication
10. Organizational skills
11. Drawing preparation

VTP GROUP Interview FAQs

How many rounds are there in VTP GROUP Deputy General Manager Civil interview?
VTP GROUP interview process usually has 1 rounds. The most common rounds in the VTP GROUP interview process are Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 VTP GROUP interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 357 Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
Sobha Interview Questions
3.9
 • 123 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
View all

VTP GROUP Deputy General Manager Civil Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

3.0

Work-Life balance

3.0

Salary & Benefits

3.0

Job Security

2.0

Company culture

4.0

Promotions/Appraisal

2.0

Work Satisfaction

Explore 1 Review and Rating
Senior Engineer
14 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Senior Accounts Executive
13 salaries
unlock blur

₹3.8 L/yr - ₹6.2 L/yr

Sales Manager
12 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Assistant Manager
11 salaries
unlock blur

₹4.6 L/yr - ₹6.3 L/yr

Executive Accountant
10 salaries
unlock blur

₹2.5 L/yr - ₹3.2 L/yr

Explore more salaries
Compare VTP GROUP with

Godrej Industries Group

4.0
Compare

Tata Group

4.2
Compare

Adani Group

3.9
Compare

Reliance Industries

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview