VTP GROUP Senior MEP Engineer Interview Questions and Answers

Updated 6 Oct 2023

VTP GROUP Senior MEP Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Apr 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About Electrical and PHE
  • Q2. SLD about Residential Commercial high rise buildings
  • Q3. About Planning and Infrastructure setup
  • Q4. About STP WTP LT-Transformer Cabling HT LT pannels Conduit Plumbing and Firefighting with Public announcement system
  • Q5. About Job skills and experience
Round 3 - HR 

(1 Question)

  • Q1. About your self and others

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through your best Basics and lates job profile

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Previous experience
  • Q2. About previous project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Reconciliation format with example of construction materials
  • Q2. Types of foundation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All related your experience
Round 3 - HR 

(1 Question)

  • Q1. Hr type question
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Waterproofing layer
  • Q2. Plaster quantity

VTP GROUP Interview FAQs

How many rounds are there in VTP GROUP Senior MEP Engineer interview?
VTP GROUP interview process usually has 3 rounds. The most common rounds in the VTP GROUP interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in VTP GROUP Senior MEP Engineer interview?

Some of the top questions asked at the VTP GROUP Senior MEP Engineer interview -

  1. About STP WTP LT-Transformer Cabling HT LT pannels Conduit Plumbing and Firefig...read more
  2. SLD about Residential Commercial high rise buildi...read more
  3. About Planning and Infrastructure se...read more

Tell us how to improve this page.

VTP GROUP Senior MEP Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 136 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
Kalpataru Limited Interview Questions
4.1
 • 101 Interviews
DLF Interview Questions
3.9
 • 77 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 59 Interviews
View all

VTP GROUP Senior MEP Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
14 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Sales Manager
13 salaries
unlock blur

₹3.6 L/yr - ₹9.6 L/yr

Senior Accounts Executive
12 salaries
unlock blur

₹3.8 L/yr - ₹6.2 L/yr

Assistant Manager
11 salaries
unlock blur

₹4.6 L/yr - ₹6.3 L/yr

Junior Engineer Civil
10 salaries
unlock blur

₹2.4 L/yr - ₹3.2 L/yr

Explore more salaries
Compare VTP GROUP with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview