Upload Button Icon Add office photos

Filter interviews by

Varindera Constructions Senior Engineer Interview Questions and Answers

Updated 31 Mar 2021

Varindera Constructions Senior Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What have I done earlier

Interview Preparation Tips

Interview preparation tips for other job seekers - Just go with the confidence with what you have done earlier

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Are you Reddy? And From AP.
  • Q2. Do you know Telugu?
  • Q3. Are you ready to relocate? And we will not give you near about your native place...
  • Q4. You do not know our policy.
Round 3 - HR 

(2 Questions)

  • Q1. All are fake documents, you do not know Telugu, we will decide how many salary is able to provide..
  • Q2. We will give you 5%hike .. and we will deduct 15% . Those are only benefits from employer.
Round 4 - At site 

(2 Questions)

  • Q1. Again rumours interview.
  • Q2. Do you know about GVPR . N work only follow instructions...

Interview Preparation Tips

Interview preparation tips for other job seekers - This is better than other companies... Ut no facilities, what ever employees need.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience about finishing work of building project.
  • Ans. 

    I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.

    • Managed finishing work such as painting, flooring, and fixtures to meet project deadlines

    • Coordinated with subcontractors and vendors to ensure materials and labor were on schedule

    • Implemented quality control measures to maintain high standards of workmanship

    • Resolved any issues or discrepancies d...

  • Answered by AI
  • Q2. What is DPR? What is DLP period?
  • Ans. 

    DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.

    • DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.

    • DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why I want to do job change?
  • Ans. 

    Seeking new challenges, growth opportunities, and a better work-life balance.

    • Looking for new challenges and opportunities to grow professionally.

    • Seeking a better work-life balance.

    • Interested in working with new technologies or industries.

    • Want to expand my skill set and knowledge.

    • Seeking a more supportive or collaborative work environment.

  • Answered by AI
  • Q2. What is your expectations of CTC?
  • Ans. 

    I expect a competitive salary based on my experience, skills, and the market standards.

    • Expectation of a salary package that reflects my qualifications and experience

    • Consideration of market standards and industry norms

    • Open to negotiation based on additional benefits or perks offered

    • Looking for a fair and transparent compensation structure

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. CoS billing procedure
  • Q2. Client billing
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Experience details.
  • Q2. Joining condition

Interview Preparation Tips

Interview preparation tips for other job seekers - Easy
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. They are Asked General question about Yourself and Company and why you want to switch.
  • Q2. Schedule Interview for Technical round
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me About Yourself
  • Q2. Your Current job role and how to plan to work ,how much productivity of labour , Some IS code . Slab Cycle
  • Q3. Why you change your current job
Round 3 - HR 

(4 Questions)

  • Q1. Documents submission
  • Q2. Salary negotiation
  • Q3. Offer package and gove Joining Letter.
  • Q4. Medical examine applicable after result if you fit then you resigned from your current company and join as per discussion time .

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to be confident and give answer gently and if you don't know about questions give skip for another. And prepare current responsibility.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the construction procedure
  • Ans. 

    Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.

    • Planning and designing the project

    • Obtaining necessary permits

    • Site preparation and excavation

    • Foundation construction

    • Framing and structural work

    • Installation of utilities and systems

    • Finishing touches such as painting and flooring

    • Final inspections and approvals

  • Answered by AI
  • Q2. What's is the beam lapping position
  • Ans. 

    Beam lapping position refers to the location where two beams overlap or intersect in a structural element.

    • Beam lapping position is important for ensuring structural integrity and load-bearing capacity.

    • Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.

    • Proper beam lapping position is determined by engineering calculations and design specifications.

  • Answered by AI
  • Q3. What is the tile procedure
  • Ans. 

    The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.

    • The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.

    • It is commonly used in graphic design software to create seamless textures or backgrounds.

    • The size and shape of the tiles can be adjusted to achieve different visual effects.

    • Examples of tile ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Self introduction, current project status,and what you have done in project.
Round 3 - Technical 

(1 Question)

  • Q1. Tells Status of round -1, and are you allocated for what they wanted location,if you are agree then continue the final of HR
Round 4 - Technical 

(1 Question)

  • Q1. Asks current CTC and expected CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont fear of interview, tell us what you capable of the position.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Productivity of Machinery & Manpower
  • Ans. 

    Productivity of machinery and manpower is crucial for efficient operations.

    • Efficient machinery and skilled manpower can increase productivity.

    • Regular maintenance of machinery can prevent downtime and increase productivity.

    • Proper training and motivation of manpower can also improve productivity.

    • Use of automation and technology can further enhance productivity.

    • Productivity can be measured using metrics such as output per

  • Answered by AI
  • Q2. Standard thumb rule in estimation
  • Ans. 

    Standard thumb rule in estimation

    • Thumb rule is a rough estimate based on experience

    • It is not accurate and can vary based on project

    • Example: 1 hour per page for content writing

    • Example: 1 month per developer for a software project

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be precise and accurate. Information of planning software.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

Varindera Constructions Interview FAQs

How to prepare for Varindera Constructions Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Varindera Constructions. The most common topics and skills that interviewers at Varindera Constructions expect are Finishing, Structural, Building Construction, Fire Fighting and HVAC.

Tell us how to improve this page.

Varindera Constructions Senior Engineer Salary
based on 19 salaries
₹4.9 L/yr - ₹8.5 L/yr
28% less than the average Senior Engineer Salary in India
View more details

Varindera Constructions Senior Engineer Reviews and Ratings

based on 7 reviews

3.6/5

Rating in categories

2.8

Skill development

3.2

Work-life balance

3.4

Salary

2.8

Job security

2.6

Company culture

3.0

Promotions

2.9

Work satisfaction

Explore 7 Reviews and Ratings
Civil Foreman
25 salaries
unlock blur

₹3.3 L/yr - ₹6 L/yr

Store Incharge
24 salaries
unlock blur

₹3 L/yr - ₹9.6 L/yr

Assistant Manager
23 salaries
unlock blur

₹5.4 L/yr - ₹12 L/yr

Civil Site Engineer
20 salaries
unlock blur

₹1.9 L/yr - ₹5.4 L/yr

Senior Engineer
19 salaries
unlock blur

₹4.9 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Varindera Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview