Filter interviews by
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Jan 2023. There were 4 interview rounds.
posted on 8 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
posted on 26 Jan 2025
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 14 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
based on 7 reviews
Rating in categories
Civil Foreman
25
salaries
| ₹3.3 L/yr - ₹6 L/yr |
Store Incharge
24
salaries
| ₹3 L/yr - ₹9.6 L/yr |
Assistant Manager
23
salaries
| ₹5.4 L/yr - ₹12 L/yr |
Civil Site Engineer
20
salaries
| ₹1.9 L/yr - ₹5.4 L/yr |
Senior Engineer
19
salaries
| ₹4.9 L/yr - ₹8.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group