Upload Button Icon Add office photos

Vaaman Engineers

Compare button icon Compare button icon Compare

Filter interviews by

Vaaman Engineers Purchaser Interview Questions and Answers for Freshers

Updated 5 Nov 2023

Vaaman Engineers Purchaser Interview Experiences for Freshers

1 interview found

Purchaser Interview Questions & Answers

user image Anonymous

posted on 5 Nov 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Common behaviour question and mostly question will be ask from resume
Round 3 - One-on-one 

(1 Question)

  • Q1. In second round was taken by ceo mostly he is checking you negotiating skill, basic purchasing skill and your communication skill
Round 4 - Technical 

(1 Question)

  • Q1. This round was taken by cco they will ask mostly technical question from your education background and basic things of tax , invoices , HSN/SAC code.

Interview questions from similar companies

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 12 Jun 2021

I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How is lapping of beam done.
  • Ans. 

    Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.

    • The beam is placed on a lapping machine with an abrasive surface.

    • The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.

    • The process is repeated with finer and finer abrasives until the desired finish is achieved.

    • Lapping can improve the strength and durability of the beam.

    • It is comm...

  • Answered by AI
  • Q2. How much cube samples are taken for 60 cum of concrete.
  • Ans. 

    The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.

    • The number of cube samples may vary depending on the project specifications and requirements.

    • Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.

    • The cube samples are taken to test the compressive strength of the concrete.

    • The number of cube samples may also depend on the locat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm , listen carefully try your answe to the point and short.. Main a good english communication..

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tower cranes erection,batching plant maintenance and electrical safety
  • Q2. Ok normal

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal not tough

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 25 Feb 2015

Interview Questionnaire 

1 Question

  • Q1. Questions were from bending moment and shear force diagrams;

Interview Preparation Tips

Round: Test
Experience: Technical (Structural engineering questions only) and aptitude test

Round: Technical Interview
Tips: Questions on Earthquake engineering, structural dynamics,Design of RC and steel structures can also be asked.

Round: HR Interview
Experience: HR interview is trivial if you are selected through technical interview.

General Tips: Technical/aptitude test and technical interview had maximum weightage. If you crack it the best way, you are in!
Skill Tips: CGPA does not help much. Internship, project etc. questions were not asked.
Skills: Aptitude skills, Technical skills, Designing skills
College Name: IIT MADRAS

Interview Questionnaire 

1 Question

  • Q1. Planning & Billing

I applied via Walk-in and was interviewed before Aug 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell daily maintenance schedules of machineries
  • Ans. 

    Daily maintenance schedules of machineries

    • Check oil levels and top up if necessary

    • Inspect and clean filters

    • Check for any signs of wear and tear

    • Lubricate moving parts

    • Check for any leaks or unusual noises

    • Perform any necessary repairs or replacements

    • Keep a record of maintenance performed

  • Answered by AI
  • Q2. Tell how many types of oils uses in construction machinery
  • Ans. 

    Construction machinery uses various types of oils depending on their functions.

    • There are different types of oils used in construction machinery such as engine oil, hydraulic oil, gear oil, transmission oil, and brake oil.

    • Engine oil is used to lubricate the engine and prevent wear and tear.

    • Hydraulic oil is used to transfer power in hydraulic systems.

    • Gear oil is used to lubricate gears and bearings in gearboxes.

    • Transmiss...

  • Answered by AI
  • Q3. How to repair hydraulic pump?
  • Ans. 

    To repair a hydraulic pump, first identify the problem and then disassemble the pump to replace or repair the faulty parts.

    • Identify the problem by checking for leaks, unusual noises, or loss of pressure.

    • Disassemble the pump carefully, taking note of the order of parts and any seals or gaskets.

    • Inspect the parts for damage or wear, and replace any faulty components.

    • Reassemble the pump, making sure all parts are properly ...

  • Answered by AI
  • Q4. What is the reason of engine failure ?
  • Ans. 

    Engine failure can be caused by various factors such as overheating, lack of maintenance, wear and tear, and manufacturing defects.

    • Overheating due to lack of coolant or oil

    • Lack of maintenance such as not changing oil or air filters

    • Wear and tear of engine components such as pistons, bearings, and valves

    • Manufacturing defects such as faulty parts or poor assembly

    • Fuel contamination or incorrect fuel usage

    • Improper installat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Tough

Interview Questionnaire 

1 Question

  • Q1. They have ask questions regarding belt conveyor maintenance,R.G.CRUSHER,PLUMBER BLOCK , BEARING AND GEARBOX

Interview Questionnaire 

1 Question

  • Q1. What is acceptable salary
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About boiler operation
  • Ans. Details of Startup and shutdown procedure. Emergency handling and coal classification.
  • Answered Anonymously
  • Q2. Boiler efficiency and how to overcome the factors affecting efficiency
  • Ans. 

    Boiler efficiency is the measure of how effectively a boiler converts fuel into steam. Factors affecting efficiency can be overcome by proper maintenance and optimization.

    • Regular cleaning and maintenance of the boiler to remove soot and scale buildup

    • Optimizing combustion by adjusting air-to-fuel ratio and ensuring proper fuel atomization

    • Insulating boiler components to minimize heat loss

    • Using economizers to recover wast...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For freshers this would be nice organization but experience person have to think.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Instrument branch

Interview Preparation Tips

Topics to prepare for Power Mech Projects Engineer interview:
  • instrument and control system
Interview preparation tips for other job seekers - india is best country.

Vaaman Engineers Interview FAQs

How many rounds are there in Vaaman Engineers Purchaser interview for freshers?
Vaaman Engineers interview process for freshers usually has 4 rounds. The most common rounds in the Vaaman Engineers interview process for freshers are Resume Shortlist, HR and One-on-one Round.
What are the top questions asked in Vaaman Engineers Purchaser interview for freshers?

Some of the top questions asked at the Vaaman Engineers Purchaser interview for freshers -

  1. In second round was taken by ceo mostly he is checking you negotiating skill, b...read more
  2. This round was taken by cco they will ask mostly technical question from your e...read more
  3. Common behaviour question and mostly question will be ask from res...read more

Tell us how to improve this page.

Vaaman Engineers Purchaser Interview Process for Freshers

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 252 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all
Mechanical Engineer
124 salaries
unlock blur

₹1.6 L/yr - ₹5.6 L/yr

Shift Incharge
77 salaries
unlock blur

₹2.5 L/yr - ₹6.5 L/yr

Safety Officer
56 salaries
unlock blur

₹2.2 L/yr - ₹5.3 L/yr

Mechanical Maintenance Engineer
51 salaries
unlock blur

₹2.3 L/yr - ₹7.2 L/yr

Shift Engineer
44 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

Explore more salaries
Compare Vaaman Engineers with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview