The least count of surveying staff is the smallest measurement that can be read from the instrument.
It is important to know the least count of the instrument to ensure accurate measurements.
The least count varies depending on the instrument used.
For example, the least count of a theodolite may be 20 seconds, while the least count of a level may be 0.5 mm.
The least count is usually specified in the instrument manual or ...
Aggregates are materials used in construction. There are two types: coarse and fine.
Coarse aggregates are larger than 4.75mm in size, e.g. gravel, crushed stone, slag.
Fine aggregates are smaller than 4.75mm in size, e.g. sand, natural stone dust.
Aggregates are used in concrete, mortar, and asphalt.
The quality of aggregates affects the strength and durability of the construction material.
The dimensions of steel bar used in column depend on the load it needs to bear and the design specifications.
The size and spacing of steel bars in a column are determined by the structural engineer.
The diameter of steel bars used in columns can range from 12mm to 40mm.
The spacing between steel bars in a column can range from 75mm to 150mm.
The number of steel bars used in a column depends on the load it needs to bear.
Th...
Top trending discussions
I applied via campus placement at Chhatrapati Shahu Ji Maharaj University (CSJMU) and was interviewed in Mar 2024. There was 1 interview round.
posted on 16 Aug 2024
I applied via Company Website and was interviewed in Jul 2023. There were 2 interview rounds.
the sum of the voltage differences around any closed loop in a circuit must be
According to Kirchhoff's Voltage Law, The voltage around a loop equals the sum of every voltage drop in the same loop for any closed network and equals zero
The total current entering a junction or a node is equal to the charge leaving the node as no charge is lost.
posted on 1 Oct 2023
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 22 Jun 2024
WBSEDCL is a government-owned electricity distribution company in West Bengal, India.
WBSEDCL is responsible for distributing electricity to various parts of West Bengal.
It operates and maintains the electricity distribution network in the state.
WBSEDCL also handles billing, customer service, and other related activities.
The company aims to provide reliable and affordable electricity to the residents of West Bengal.
posted on 25 Nov 2023
I applied via Campus Placement and was interviewed in Jan 2023. There were 2 interview rounds.
posted on 21 Jun 2022
I applied via Company Website and was interviewed in May 2022. There was 1 interview round.
Answers to various technical questions related to electronics and communication engineering.
Amplitude modulation is a technique of modulating a signal by varying its amplitude.
Modulation is done to transmit a signal over a long distance without losing its quality.
The relationship between antenna length and frequency is inversely proportional.
Disadvantages of AM include low efficiency, susceptibility to noise and interf...
I applied via Company Website and was interviewed before Jan 2019. There were 3 interview rounds.
based on 11 reviews
Rating in categories
Computer Operator
5
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Site Engineer
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Account Assistant
4
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Civil Engineer
4
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Junior Engineer Civil
4
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Maharashtra State Road Development Corporation Ltd.
Gujarat State Road Development
Rajasthan State Road Development & Construction Corporation
Tamil Nadu Road Development Company