I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
Minimum tests for piling include integrity testing, load testing, and pile driving analyzer (PDA) testing.
Integrity testing is done to ensure that the pile is free from defects and damage.
Load testing is done to determine the load capacity of the pile.
Pile driving analyzer (PDA) testing is done to measure the stresses and strains in the pile during driving.
Other tests may include crosshole sonic logging (CSL) and therm
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
Prioritize tasks and delegate responsibilities based on urgency and importance.
Assess the workload and prioritize tasks based on urgency and importance
Delegate responsibilities to team members based on their strengths and workload
Cross-train employees to ensure flexibility in case of absences
Consider hiring temporary staff or outsourcing work if necessary
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
10th level question with answers
About our work experience
posted on 23 May 2023
Earthing is the process of connecting the metallic parts of an electrical installation to the earth electrode.
Earthing protects people and equipment from electric shock.
The earthing system should have low impedance to ensure proper functioning.
The earthing system should be periodically tested to ensure its effectiveness.
Different types of earthing systems include plate earthing, pipe earthing, and rod earthing.
Earthing...
Start delta start and dual starter are two different methods of starting a motor.
Start delta start is a method of starting a motor with reduced voltage by initially connecting the motor windings in a star configuration and then switching to delta configuration after a few seconds.
Dual starter is a method of starting a motor with reduced voltage by using two contactors, one for the star connection and the other for the ...
The transfer operation replay for gas is a safety feature that automatically shuts off the gas supply in case of a transfer failure.
The replay is a device that detects a transfer failure and triggers the shut off valve.
It is important for preventing gas leaks and potential explosions.
Examples of transfer operation replay for gas include the Fisher Type 63EG, the Cashco Model C-1590, and the Valvcon V-Series.
The name of...
Start delta starter is mostly used for loads ranging from 5 to 50 horsepower.
Start delta starter is a method of starting three-phase motors
It is commonly used for loads that require high starting torque
The load range for start delta starter is typically between 5 to 50 horsepower
It is not recommended for loads that require frequent starting and stopping
I appeared for an interview in Mar 2024.
I specialize in all types of electrical wiring and CCTV camera installation.
Experienced in installing various types of electrical wiring such as residential, commercial, and industrial
Proficient in setting up CCTV cameras for surveillance and security purposes
Knowledgeable in troubleshooting electrical issues and ensuring proper installation practices
All types of electric wiring involve the installation and connection of electrical components to provide power to devices and systems.
Different types of electric wiring include residential, commercial, and industrial wiring
Each type of wiring requires specific materials and techniques for installation
Examples of electric wiring components include cables, wires, switches, outlets, and circuit breakers
CCTV camera installation involves mounting cameras, running cables, connecting to a recording device, and setting up monitoring software.
Plan camera placement for optimal coverage
Run cables neatly and securely to avoid damage
Connect cameras to a recording device or network video recorder (NVR)
Set up monitoring software for remote viewing and recording
Test the system to ensure all cameras are functioning properly
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
Lead Engineer
32
salaries
| ₹3.5 L/yr - ₹14.8 L/yr |
Senior Engineer
23
salaries
| ₹5.5 L/yr - ₹13 L/yr |
Deputy Chief Engineer
16
salaries
| ₹10.5 L/yr - ₹16 L/yr |
Engineer
11
salaries
| ₹2 L/yr - ₹11.4 L/yr |
Plant Engineer
11
salaries
| ₹6.6 L/yr - ₹15 L/yr |
UTL Solar
Danfoss Power Solutions
LM Wind Power
Senvion