Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2022. There were 3 interview rounds.
Top trending discussions
posted on 28 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
posted on 20 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
posted on 20 Jun 2024
Stress strain is a measure of the relationship between the force applied to a material and the resulting deformation. Keplar reaction refers to the principle of action and reaction in mechanics.
Stress strain is a measure of how a material deforms under a given load.
Stress is the force applied to a material, while strain is the resulting deformation.
Keplar reaction states that for every action, there is an equal and opp...
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
125
salaries
| ₹3 L/yr - ₹8.9 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹2.4 L/yr - ₹5.7 L/yr |
Civil Site Engineer
48
salaries
| ₹1.9 L/yr - ₹5.4 L/yr |
Assistant Manager
47
salaries
| ₹4.6 L/yr - ₹9.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group