i
UNO Minda
Filter interviews by
Some aptitude related questions
THE OLE stands for Total Human Error, a concept used in production management to quantify the total amount of human errors in a process.
THE OLE is a metric used to measure the total amount of human errors in a production process.
It helps identify areas where human errors are most prevalent and allows for targeted improvements.
For example, if a production line has a high THE OLE score, it may indicate the need for addit
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
A relay holding circuit diagram is used to keep the relay in the energized state even after the control signal is removed.
The circuit typically includes a holding contact that maintains the relay coil energized.
A latching relay can also be used for holding without continuous power supply.
Examples: ladder logic diagram with a holding contact, latching relay circuit diagram.
PNP and NPN are types of bipolar junction transistors commonly used in electronic circuits.
PNP transistor has a layer of N-type semiconductor between two layers of P-type semiconductor, while NPN transistor has a layer of P-type semiconductor between two layers of N-type semiconductor.
In a PNP transistor, current flows from the emitter to the base and then to the collector, while in an NPN transistor, current flows fro...
There are various types of sensors used for different purposes.
Temperature sensors (e.g. thermocouples, thermistors)
Pressure sensors (e.g. piezoelectric sensors)
Motion sensors (e.g. accelerometers, gyroscopes)
Proximity sensors (e.g. ultrasonic sensors)
Light sensors (e.g. photodiodes, phototransistors)
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
PLC is used to control machinery in manufacturing processes, such as assembly lines, robotic devices, or any activity that requires high reliability control.
It is programmed using a specialized computer language, typically ladder logic or function block diagram.
PLCs are commonly used in industrie...
UNO Minda interview questions for popular designations
I applied via Approached by Company
ABB robot program path is written using the RobotStudio software.
Open RobotStudio software
Create a new program
Define the robot's movements using the programming language RAPID
Test the program in the virtual environment
Download the program to the robot controller
Run the program on the physical robot
A ladder diagram is a graphical representation of a motor's forward and reverse operation.
Ladder diagrams are commonly used in industrial automation to represent the logic of electrical circuits.
The forward and reverse operation of a motor can be represented using two separate ladder diagrams.
In the forward ladder diagram, the motor is connected to a power source through a set of contacts that are closed when a start b...
Get interview-ready with Top UNO Minda Interview Questions
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I applied via Job Portal and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 5 interview rounds.
Plant head Round:-
About the achievement & failures
I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.
Top trending discussions
The duration of UNO Minda interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 61 interviews
Interview experience
based on 2.6k reviews
Rating in categories
Senior Executive
554
salaries
| ₹2.4 L/yr - ₹8.6 L/yr |
Assistant Manager
547
salaries
| ₹5.1 L/yr - ₹15.5 L/yr |
Deputy Manager
358
salaries
| ₹6.8 L/yr - ₹18.9 L/yr |
Senior Engineer
240
salaries
| ₹3.6 L/yr - ₹9.7 L/yr |
Associate
236
salaries
| ₹1.1 L/yr - ₹4.4 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres