i
UNO Minda
Filter interviews by
P2P process stands for Procure-to-Pay process, which involves the steps from requisitioning goods/services to making payment.
P2P process starts with the requisition of goods/services by the user department.
The purchase order is then created and sent to the vendor.
Goods/services are received and the invoice is matched with the purchase order.
Payment is made to the vendor based on the invoice.
P2P process helps in streaml...
Vendor reconciliation is the process of comparing a company's records with those of its vendors to ensure accuracy and resolve discrepancies.
Matching invoices and payments to vendor statements
Identifying and resolving discrepancies
Ensuring all transactions are accurately recorded
Communicating with vendors to clarify any discrepancies
Reconciling accounts on a regular basis to maintain accurate financial records
I applied via Referral and was interviewed in Dec 2023. There were 3 interview rounds.
GD&T stands for Geometric Dimensioning and Tolerancing, a system for defining and communicating engineering tolerances.
GD&T is a system used to define and communicate engineering tolerances for parts and assemblies.
It uses symbols, dimensions, and tolerances to specify the geometric characteristics of a part.
GD&T helps ensure that parts fit together properly and function as intended.
Examples of GD&T symbols include con
Surface profile refers to the overall shape of a surface, while line profile refers to the cross-sectional shape along a specific line.
Surface profile describes the general shape and features of a surface, such as flatness, waviness, and roughness.
Line profile focuses on the cross-sectional shape along a specific line on the surface, providing detailed information about variations in height or depth along that line.
Sur...
To find coordinates of PCD circles, use a coordinate measuring machine (CMM) to measure the center points and radii of the circles.
Use a CMM to measure the center point (X, Y) and radius (R) of each circle.
Calculate the coordinates of the PCD circles based on the measured center points and radii.
PCD circles are typically used in engineering for positioning holes or features on a part.
Example: If the center point of a c...
RPS alignment stands for Renishaw Productivity System alignment, a method used to align the probe on a CMM machine.
RPS alignment is a process used to ensure the probe on a CMM machine is accurately aligned for precise measurements.
It involves setting up the probe in a specific orientation relative to the machine's axes.
RPS alignment helps improve the accuracy and repeatability of measurements taken by the CMM.
It is com...
Types of layout include process layout, product layout, fixed position layout, and combination layout.
Process layout: Arranges similar machines or equipment together based on the process they perform.
Product layout: Organizes equipment in a line according to the sequence of operations required to manufacture a product.
Fixed position layout: Involves keeping the product stationary while workers, materials, and equipment...
MSA stands for Measurement System Analysis. It is a study that evaluates the measurement system's reliability, accuracy, and precision.
MSA helps in identifying the sources of variation in the measurement process.
It consists of three main aspects: Accuracy, Precision, and Repeatability.
Examples of MSA tools include Gage R&R (Repeatability and Reproducibility) studies and Bias studies.
Part selection criteria for MSA involves considering factors like part complexity, material, size, and critical features.
Consider part complexity to ensure accurate measurement
Select materials that are stable and suitable for measurement equipment
Size of the part should be within the measurement range of the equipment
Identify critical features that need to be measured accurately
Ensure parts are representative of the ov...
Gauge acceptance criteria are the specifications that a part must meet in order to be considered acceptable for use.
Gauge acceptance criteria are typically based on the part's dimensions, tolerances, and other relevant specifications.
These criteria are established to ensure that parts meet the required quality standards and will function properly in their intended application.
For example, a gauge acceptance criteria fo...
I once failed to catch a critical error in a CMM program, resulting in scrapped parts and production delays.
Misinterpreted a dimension on a drawing, leading to incorrect programming
Failed to thoroughly verify program before running it on the machine
Lack of communication with the engineering team about program changes
Implemented corrective actions to prevent similar mistakes in the future
Seeking new challenges and growth opportunities in a dynamic work environment.
Looking for opportunities to expand my skills and knowledge in CMM programming
Interested in working with new technologies and tools
Seeking a more collaborative and innovative work culture
Want to take on more responsibilities and contribute to a larger team
I am looking for a new opportunity at Minda to further develop my skills in CMM programming.
Seeking a new challenge and growth opportunities
Interested in working with advanced technology at Minda
Excited about the company's reputation in the industry
I am a skilled CMM Programmer with experience in programming and operating Coordinate Measuring Machines.
Experienced in writing and editing CMM programs
Proficient in operating CMM machines to measure parts accurately
Knowledgeable in GD&T and blueprint reading
Familiar with various measurement tools and techniques
I applied via Approached by Company and was interviewed in Mar 2024. There were 4 interview rounds.
UNO Minda interview questions for popular designations
I applied via Naukri.com and was interviewed in Feb 2024. There were 5 interview rounds.
Get interview-ready with Top UNO Minda Interview Questions
I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.
Top trending discussions
The duration of UNO Minda interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 61 interviews
Interview experience
based on 2.6k reviews
Rating in categories
Senior Executive
554
salaries
| ₹2.4 L/yr - ₹8.6 L/yr |
Assistant Manager
547
salaries
| ₹5.1 L/yr - ₹15.5 L/yr |
Deputy Manager
358
salaries
| ₹6.8 L/yr - ₹18.9 L/yr |
Senior Engineer
240
salaries
| ₹3.6 L/yr - ₹9.7 L/yr |
Associate
236
salaries
| ₹1.1 L/yr - ₹4.4 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres