Sr. Enggineer (Billing) Interview Questions & Answers

user image Anonymous

posted on 2 Dec 2020

I applied via Referral and was interviewed before Dec 2019. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Why a good company suddenly shut down?
  • Q2. What about staffs balance salary PF and clearance of gratuity?
  • Q3. Can unity rise again in market?
  • Q4. What would be the current status of Unity?

Interview Preparation Tips

Interview preparation tips for other job seekers - If company feel we can rejoin with the good organization.

Skills evaluated in this interview

I applied via Referral and was interviewed before Jun 2020. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What is formation width?
  • Ans. 

    Formation width is the width of the prepared surface of the subgrade and the base course of a road or highway.

    • Formation width is the width of the prepared surface of the subgrade and the base course of a road or highway.

    • It is the width of the foundation of the road or highway.

    • It is important to ensure that the formation width is sufficient to support the weight of the traffic that will use the road or highway.

    • The forma...

  • Answered by AI
  • Q2. It is the actual carriage way where vehicles are moved.
  • Q3. What is crown?
  • Ans. 

    Crown is the slope given to the surface of a road or highway to allow for proper drainage.

    • Crown is the highest point of the road surface, usually at the centerline.

    • It is designed to allow water to drain off the road surface and prevent pooling.

    • The slope of the crown depends on the road's width and the amount of rainfall in the area.

    • Crown is important for safety as it reduces the risk of hydroplaning and improves visibi...

  • Answered by AI
  • Q4. It is the centre of road.
  • Q5. What is mean by PQC?
  • Ans. 

    PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.

    • PQC is a high-quality concrete mix used for the top layer of road construction.

    • It is designed to provide a smooth and durable surface for vehicles to travel on.

    • PQC is typically used for highways, airports, and other high-traffic areas.

    • It is made with a higher strength and lower water-cement ratio than regular concrete.

    • PQC is a...

  • Answered by AI
  • Q6. It is the paving quality concrete.

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview is based on technical and personal questions. Where they try to confuse yourself but don't be loose your patience. Stay calm and confident.

Civil Engineer-Highway/Roadway Interview Questions asked at other Companies

Q1. 1-length on one rail. 2-types of rail in india 3- ductility of bitumens. 4-how many sleepers in 13m rail. 5-which load are carrying on the rail when train running.
View answer (4)

Senior Construction Engineer Structural Interview Questions & Answers

user image Anonymous

posted on 6 Jan 2021

I applied via Recruitment Consultant and was interviewed before Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Civil based mainly doing in Mumbai municipal corporation works.
  • Q2. Regional

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences

I applied via Approached by Company and was interviewed in Aug 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About myself and salary expectations.... And the further proceedings
Round 3 - Technical 

(7 Questions)

  • Q1. Questions from IS Code 1200
  • Q2. All construction materials watage percentages
  • Ans. 

    The wastage percentages of construction materials vary depending on the type of material and the project requirements.

    • Wastage percentages can range from 2-5% for cement and steel to 10-15% for bricks and tiles.

    • Factors that affect wastage include the skill level of workers, the quality of materials, and the complexity of the project.

    • Proper planning and management can help minimize wastage and reduce project costs.

    • Regula...

  • Answered by AI
  • Q3. Rolling margin of steel
  • Ans. 

    Rolling margin of steel is the difference between the cost of producing steel and the selling price.

    • It is a measure of profitability for steel manufacturers.

    • It is calculated by subtracting the cost of production from the selling price.

    • A higher rolling margin indicates higher profitability.

    • Factors that affect rolling margin include raw material costs, energy costs, and market demand.

  • Answered by AI
  • Q4. Worker productivity and machinaries productivity for planning
  • Ans. 

    Worker and machinery productivity are crucial for effective planning.

    • Worker productivity can be measured by the amount of work completed in a given time period.

    • Machinery productivity can be measured by the amount of output produced by the machinery in a given time period.

    • Both worker and machinery productivity should be taken into account when planning to ensure efficient use of resources.

    • For example, if workers are mor...

  • Answered by AI
  • Q5. About my previous employment roles and responsibilities
  • Q6. List of deductions in client bill
  • Ans. 

    Deductions in client bill include taxes, discounts, late fees, and service charges.

    • Taxes: Sales tax, VAT, GST, etc.

    • Discounts: Promotions, loyalty rewards, bulk discounts, etc.

    • Late fees: Charges for overdue payments.

    • Service charges: Fees for additional services provided.

  • Answered by AI
  • Q7. Retention and TDS in sub con bill
  • Ans. 

    Retention and TDS are important factors to consider in subcontractor billing.

    • Retention refers to the amount of money withheld by the client as a form of security against any defects or issues that may arise after the project is completed.

    • TDS (Tax Deducted at Source) is the tax deducted by the client from the subcontractor's payment and deposited with the government.

    • Both retention and TDS should be clearly mentioned in ...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. It was happened with site Site personal and questions are so basics
Round 5 - HR 

(1 Question)

  • Q1. Salary negotiation and decission about all benefits

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare and be strong in you role, Questions will be simple, if u r good in your path.

Interview Questionnaire 

4 Questions

  • Q1. What will you do when material is not received in time at site ?
  • Ans. 

    I will assess the situation and take necessary actions to minimize the impact on the project timeline.

    • Check with the supplier for the reason of delay and expected delivery date

    • Evaluate the impact on the project timeline and inform the project team

    • Explore alternative options such as sourcing from a different supplier or adjusting the project schedule

    • Communicate the revised plan to all stakeholders and ensure timely deli...

  • Answered by AI
  • Q2. How do you manage the team ?
  • Ans. Should maintain proper communication between team members. Good planning assists allocation of work responsibilities to team members, also it avoids irrational approach and duplication of works. As a best team player can complete the project within a specified time and budget.
  • Answered Anonymously
  • Q3. How do you calculate the cement and sand for 1 sqm cm 1:4?
  • Ans. 

    To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.

    • The ratio of cement to sand is 1:4

    • Calculate the total volume of the mixture, which is 1 sqm cm

    • Divide the total volume by the sum of the ratio (1+4=5)

    • Multiply the quotient by the individual ratio to get the volume of cement and sand

    • Convert the volume to weight using the de

  • Answered by AI
  • Q4. What is price escalation?
  • Ans. 

    Price escalation refers to the increase in the price of goods or services over time.

    • It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.

    • Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.

    • For example, the price of gasoline may escalate due to an increase in the cost of c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions are majorly from technical side as per your experience and civil Engineering subjects. Some of the questions related to IS Codes.

Interview Questionnaire 

4 Questions

  • Q1. How to manage team
  • Q2. I say man key of engineering lead and response
  • Q3. Why can you change company
  • Q4. I tell skills and develop self

I applied via Company Website and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Why you are leaving your present employer ?
  • Ans. For better opportunity & growth like Salary hike & new changing work environment. because people use to get lazy in one place in longer time.
  • Answered Anonymously
  • Q2. Then you will leave us also shortly ?
  • Ans. 

    The question implies that the interviewer is questioning the candidate's potential departure from the company.

    • The question suggests that the interviewer may have concerns about the candidate's long-term commitment.

    • The candidate should address the concern by explaining their career goals and commitment to the role.

    • Providing examples of past experiences where the candidate has demonstrated long-term commitment can help a

  • Answered by AI
  • Q3. When you get angry in last time ?
  • Q4. No idea , because here I'm here for a mission to achieve the common goal. Ladai and Alochanana kisi masle ka hal nahin hota.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident , be honest & loyal all the time. Say politely even 1 question is asking to you repeatedly. brief how can you help organization.
Interview experience
-
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2018. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Salary Expectation?
  • Q2. How early you can join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare job specific answers

I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Used IRC codes and SP
  • Ans. 

    Yes

    • IRC codes and SP are commonly used in structural engineering

    • IRC codes refer to the Indian Road Congress codes, which provide guidelines for the design and construction of roads and bridges in India

    • SP refers to the Standards and Practices, which are specific codes and regulations followed in the field of structural engineering

    • Engineers use IRC codes and SP to ensure the safety, stability, and durability of structures

    • ...

  • Answered by AI
  • Q2. Some common background questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and confident revise your technical knowledge which u r currently working

Skills evaluated in this interview

Unity Infraprojects Interview FAQs

What are the top questions asked in Unity Infraprojects interview?

Some of the top questions asked at the Unity Infraprojects interview -

  1. what about staffs balance salary PF and clearance of gratuit...read more
  2. what would be the current status of Uni...read more
  3. can unity rise again in mark...read more

Tell us how to improve this page.

Unity Infraprojects Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more

Unity Infraprojects Reviews and Ratings

based on 75 reviews

3.8/5

Rating in categories

4.0

Skill development

4.1

Work-life balance

3.9

Salary

3.6

Job security

3.8

Company culture

3.9

Promotions

3.9

Work satisfaction

Explore 75 Reviews and Ratings
Site Engineer
7 salaries
unlock blur

₹2.5 L/yr - ₹4 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹3.5 L/yr - ₹4 L/yr

Assistant Manager
6 salaries
unlock blur

₹2.7 L/yr - ₹11.9 L/yr

Civil Engineer
6 salaries
unlock blur

₹1.5 L/yr - ₹8.9 L/yr

Senior Engineer
5 salaries
unlock blur

₹5 L/yr - ₹6.1 L/yr

Explore more salaries
Compare Unity Infraprojects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.3
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview