Formation width is the width of the prepared surface of the subgrade and the base course of a road or highway.
Formation width is the width of the prepared surface of the subgrade and the base course of a road or highway.
It is the width of the foundation of the road or highway.
It is important to ensure that the formation width is sufficient to support the weight of the traffic that will use the road or highway.
The forma...
Crown is the slope given to the surface of a road or highway to allow for proper drainage.
Crown is the highest point of the road surface, usually at the centerline.
It is designed to allow water to drain off the road surface and prevent pooling.
The slope of the crown depends on the road's width and the amount of rainfall in the area.
Crown is important for safety as it reduces the risk of hydroplaning and improves visibi...
PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.
PQC is a high-quality concrete mix used for the top layer of road construction.
It is designed to provide a smooth and durable surface for vehicles to travel on.
PQC is typically used for highways, airports, and other high-traffic areas.
It is made with a higher strength and lower water-cement ratio than regular concrete.
PQC is a...
I applied via Referral and was interviewed before Dec 2019. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jan 2020. There were 3 interview rounds.
Top trending discussions
posted on 17 Feb 2025
Documents verification
posted on 25 Jan 2025
I was interviewed in Dec 2024.
posted on 21 Nov 2023
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
posted on 15 Feb 2025
I was interviewed before Feb 2024.
posted on 9 Feb 2025
Embankment is a raised bank or wall built to carry a road or to hold back water.
Embankment is a raised structure made of earth or other materials to support a road or railway.
Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.
Embankments are commonly used in road construction to elevate the road above the surrounding terrain.
Earthwork pr...
PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.
PQC laying is the process of laying the final layer of concrete pavement on roads.
It is done after the base and sub-base layers have been prepared and compacted.
PQC laying ensures a smooth and durable surface for vehicles to travel on.
Proper curing of PQC is essential to prevent cracks and ensure longevity.
Exa...
RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.
RCC drain is made of reinforced concrete to provide strength and durability.
It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.
RCC drains come in various shapes and sizes depending on the specific drainage requirements.
These drains are commonly used in urban areas to pre...
Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.
Kerb laying involves setting out the alignment and levels for the curbs.
The curbs are then placed and fixed in position using concrete or other suitable materials.
Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.
Properly laid curbs enhance the overal...
Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.
Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.
Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...
based on 2 interviews
Interview experience
based on 75 reviews
Rating in categories
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Civil Site Engineer
7
salaries
| ₹3.5 L/yr - ₹4 L/yr |
Assistant Manager
6
salaries
| ₹2.7 L/yr - ₹11.9 L/yr |
Civil Engineer
6
salaries
| ₹1.5 L/yr - ₹8.9 L/yr |
Senior Engineer
5
salaries
| ₹5 L/yr - ₹6.1 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon